{"id":5393,"date":"2018-01-23T16:22:50","date_gmt":"2018-01-23T13:22:50","guid":{"rendered":"http:\/\/www.nurolinsaat.com.tr?p=5393"},"modified":"2018-01-23T16:22:50","modified_gmt":"2018-01-23T13:22:50","slug":"construction-process-will-begin-at-goztepe-station-dokuz-sutun-17-08-2017","status":"publish","type":"post","link":"https:\/\/www.nurolinsaat.com.tr\/en\/construction-process-will-begin-at-goztepe-station-dokuz-sutun-17-08-2017.html","title":{"rendered":"Construction Process will Begin at G\u00f6ztepe Station | Dokuz S\u00fctun \/ 17.08.2017"},"content":{"rendered":"<p>ISTANBUL The construction of G\u00f6ztepe station for ongoing construction of \u00dcmraniye-Ata\u015fehir-G\u00f6ztepe Metro will begin. The tennis courts of G\u00f6ztepe 60th Year Park will be used as temporary construction site throughout the construction of station. The green areas will not be affected by any of the works, and the construction work of \u00dcmraniye-Ata\u015fchir-G\u00f6ztepe Metro, which is implemented by Istanbul Metropolitan Municipality, is in full flow. Within the scope of the construction of G\u00f6ztepe station on the line, the area where the tennis courts of G\u00f6ztepe 60. Yil Park are located, will be used as temporary construction site. The green areas where the trees are located will not be affected by any of the works. Following the completion of the works, the mentioned area will have the metro entrances and exits, a metro square, 2 basketball fields and children traffic training park. \u00dcmraniye-Ata\u015fehir-G\u00f6ztepe Metro consists of 11 stations with 13 km. length. The line will be integrated with Marmaray at G\u00f6ztepe station and it will be integrated with Kadik\u00f6y-Kartal Metro at Yenisahra station and with \u00dcsk\u00fcdar- \u00dcmraniye-\u00c7ekmek\u00f6y Metro at \u00c7ars\u0131 station.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ISTANBUL The construction of G\u00f6ztepe station for ongoing construction of \u00dcmraniye-Ata\u015fehir-G\u00f6ztepe Metro will begin. The tennis courts of G\u00f6ztepe 60th Year Park will be used as temporary construction site throughout the construction of station. The green areas will not be affected by any of the works, and the construction work of \u00dcmraniye-Ata\u015fchir-G\u00f6ztepe Metro, which is<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[46],"class_list":["post-5393","post","type-post","status-publish","format-standard","hentry","category-nurol-construction-in-media"],"_links":{"self":[{"href":"https:\/\/www.nurolinsaat.com.tr\/en\/wp-json\/wp\/v2\/posts\/5393","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nurolinsaat.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nurolinsaat.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/en\/wp-json\/wp\/v2\/comments?post=5393"}],"version-history":[{"count":0,"href":"https:\/\/www.nurolinsaat.com.tr\/en\/wp-json\/wp\/v2\/posts\/5393\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.nurolinsaat.com.tr\/en\/wp-json\/wp\/v2\/media?parent=5393"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/en\/wp-json\/wp\/v2\/categories?post=5393"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}