{"id":5417,"date":"2018-01-23T17:20:32","date_gmt":"2018-01-23T14:20:32","guid":{"rendered":"http:\/\/www.nurolinsaat.com.tr?p=5417"},"modified":"2018-01-23T17:20:32","modified_gmt":"2018-01-23T14:20:32","slug":"650-million-highway-savings-per-year-hurriyet-bursa-12-01-2018","status":"publish","type":"post","link":"https:\/\/www.nurolinsaat.com.tr\/en\/650-million-highway-savings-per-year-hurriyet-bursa-12-01-2018.html","title":{"rendered":"$650 Million Highway Savings per Year  | H\u00fcrriyet Bursa \/ 12.01.2018"},"content":{"rendered":"<p>88 percent of the Gebze-Orhangazi-\u0130zmir Motorway, which will reduce the travel time between \u0130stanbul and \u0130zmir from 9 hours to 3.5 hours, has been completed. The highway is expected to save $650 million per year when fully in service. Approximately 98 km of highways and 16 km of connection roads were commissioned from the project, which has a 384-km highway and 49 km connection road including \u0130zmit Bay Passage and connection roads whose construction works are mostly finished. 40 km of highway section between Alt\u0131nova-Gemlik, 12.6 km between Gebze-Alt\u0131nova (including Osmangazi Bridge), 20 km between Kemalpa\u015fa intersection-\u0130zmir and 25 km between Gemlik-Bursa was completed and commissioned, while works continue in the other sections.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>88 percent of the Gebze-Orhangazi-\u0130zmir Motorway, which will reduce the travel time between \u0130stanbul and \u0130zmir from 9 hours to 3.5 hours, has been completed. The highway is expected to save $650 million per year when fully in service. Approximately 98 km of highways and 16 km of connection roads were commissioned from the project,<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[46],"class_list":["post-5417","post","type-post","status-publish","format-standard","hentry","category-nurol-construction-in-media"],"_links":{"self":[{"href":"https:\/\/www.nurolinsaat.com.tr\/en\/wp-json\/wp\/v2\/posts\/5417","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nurolinsaat.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nurolinsaat.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/en\/wp-json\/wp\/v2\/comments?post=5417"}],"version-history":[{"count":0,"href":"https:\/\/www.nurolinsaat.com.tr\/en\/wp-json\/wp\/v2\/posts\/5417\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.nurolinsaat.com.tr\/en\/wp-json\/wp\/v2\/media?parent=5417"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/en\/wp-json\/wp\/v2\/categories?post=5417"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}