{"id":13663,"date":"2019-08-08T16:30:48","date_gmt":"2019-08-08T13:30:48","guid":{"rendered":"http:\/\/www.nurolinsaat.com.tr\/?p=13663"},"modified":"2019-08-08T16:33:50","modified_gmt":"2019-08-08T13:33:50","slug":"le-date-de-linaugration-de-la-route-peripherique-dordu-est-declare-98-acheve-ordu-tribun-22-octobre-2018","status":"publish","type":"post","link":"https:\/\/www.nurolinsaat.com.tr\/fr\/le-date-de-linaugration-de-la-route-peripherique-dordu-est-declare-98-acheve-ordu-tribun-22-octobre-2018.html","title":{"rendered":"LE DATE DE L\u2019INAUGRATION DE LA ROUTE PERIPHERIQUE D\u2019ORDU EST DECLARE, 98% ACHEVE | ORDU TR\u0130B\u00dcN \/ 22 OCTOBRE 2018"},"content":{"rendered":"<p>Gouverneur Yavuz \u00ab\u00a0Les travaux li\u00e9s aux transports se poursuivent de mani\u00e8re intensive. J&rsquo;esp\u00e8re que la premi\u00e8re \u00e9tape du service d\u00e9butera au premier trimestre de 2019\u00a0\u00bb, a-t-il d\u00e9clar\u00e9. L&rsquo;autoroute Ordu sera mise en service en mars 2019. La construction a d\u00e9but\u00e9 en 2012, longueur totale aller-retour de 21,4 m\u00e8tres cubes sur les 10,7 km de la premi\u00e8re \u00e9tape de la route de l&rsquo;Ordu. Route, partant de la jonction du quartier Terz\u00fc et passant par les limites de la route, pour \u00eatre reli\u00e9e \u00e0 la route c\u00f4ti\u00e8re lors de la premi\u00e8re \u00e9tape de la longueur totale de 6,5 m\u00e8tres cubes de 3 doubles tunnels, d&rsquo;un pont de 44 m\u00e8tres de long et de 2,5 km, 5 Il y a 6 intersections, dont deux ponts et deux ponts. Le tunnel et les viaducs de l&rsquo;asphalte de la route en grande partie achev\u00e9e d&rsquo;Ordu Autoroute ont achev\u00e9 la construction de la sortie du tunnel du tunnel d&rsquo;\u00d6celi entre le viaduc d&rsquo;\u00d6ceh-1 a retard\u00e9 l&rsquo;ouverture de la route pendant un certain temps. 500 m plus loin, en raison de la poursuite du travail sur pieu for\u00e9 par glissement de terrain, a-t-il d\u00e9clar\u00e9.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Gouverneur Yavuz \u00ab\u00a0Les travaux li\u00e9s aux transports se poursuivent de mani\u00e8re intensive. J&rsquo;esp\u00e8re que la premi\u00e8re \u00e9tape du service d\u00e9butera au premier trimestre de 2019\u00a0\u00bb, a-t-il d\u00e9clar\u00e9. L&rsquo;autoroute Ordu sera mise en service en mars 2019. La construction a d\u00e9but\u00e9 en 2012, longueur totale aller-retour de 21,4 m\u00e8tres cubes sur les 10,7 km de la<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[61],"class_list":["post-13663","post","type-post","status-publish","format-standard","hentry","category-nouvelles-de-la-presse"],"_links":{"self":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/posts\/13663","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/comments?post=13663"}],"version-history":[{"count":0,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/posts\/13663\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/media?parent=13663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/categories?post=13663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}