{"id":13673,"date":"2019-08-08T16:35:41","date_gmt":"2019-08-08T13:35:41","guid":{"rendered":"http:\/\/www.nurolinsaat.com.tr\/?p=13673"},"modified":"2019-08-08T16:35:41","modified_gmt":"2019-08-08T13:35:41","slug":"la-premiere-phase-de-la-route-peripheriques-est-inaugree-karadeniz-gundem-05-mars-2019","status":"publish","type":"post","link":"https:\/\/www.nurolinsaat.com.tr\/fr\/la-premiere-phase-de-la-route-peripheriques-est-inaugree-karadeniz-gundem-05-mars-2019.html","title":{"rendered":"LA PREMIERE PHASE DE LA ROUTE PERIPHERIQUES EST INAUGREE | KARADEN\u0130Z G\u00dcNDEM \/ 05 MARS 2019"},"content":{"rendered":"<p align=\"justify\">Apr\u00e8s le meeting du pr\u00e9sident Erdogan \u00e0 Ordu, le minist\u00e8re des Transports et de l&rsquo;Infrastructure, Mehmet Cahit Turan, et le directeur g\u00e9n\u00e9ral de Autoroutes, Abdulkadir Uraoglu, ont inaugr\u00e9 la premi\u00e8re phase de la liaison en direct avec Erdogan. Minutes. Lors de la pr\u00e9paration du projet de route c\u00f4ti\u00e8re de la mer Noire, en 1994, dans le centre de la ville d\u2019Ordu Altinordu, il a \u00e9t\u00e9 demand\u00e9 \u00e0 5 km du passage du centre-ville de se remplir. Les habitants d\u2019Ordu se sont oppos\u00e9s au projet de transition de la ville et ont organis\u00e9 des marches de personnes. Le projet a alors \u00e9t\u00e9 abandonn\u00e9 et diff\u00e9rents projets ont \u00e9t\u00e9 pr\u00e9par\u00e9s sur la route Kumba\u015f\u0131-Boztepe-Karap\u0131nar. L&rsquo;appel d&rsquo;offres pour l&rsquo;autoroute a \u00e9t\u00e9 pos\u00e9 en juillet 2012. La premi\u00e8re \u00e9tape de la route, d&rsquo;une longueur totale de 21,4 km, 10,4 km kilom\u00e8tres de glissements de terrain, qui se sont produits dans les 500 m\u00e8tres du glissement de terrain ont perturb\u00e9 les travaux. Un total de 75 kilom\u00e8tres de pieux for\u00e9s a \u00e9t\u00e9 pris dans la r\u00e9gion afin de pr\u00e9venir les glissements de terrain. La premi\u00e8re \u00e9tape du p\u00e9riph\u00e9rique d&rsquo;Ordu, qui a co\u00fbt\u00e9 environ 1,9 milliard de lires, a \u00e9t\u00e9 achev\u00e9e. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Apr\u00e8s le meeting du pr\u00e9sident Erdogan \u00e0 Ordu, le minist\u00e8re des Transports et de l&rsquo;Infrastructure, Mehmet Cahit Turan, et le directeur g\u00e9n\u00e9ral de Autoroutes, Abdulkadir Uraoglu, ont inaugr\u00e9 la premi\u00e8re phase de la liaison en direct avec Erdogan. Minutes. Lors de la pr\u00e9paration du projet de route c\u00f4ti\u00e8re de la mer Noire, en 1994, dans<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[61],"class_list":["post-13673","post","type-post","status-publish","format-standard","hentry","category-nouvelles-de-la-presse"],"_links":{"self":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/posts\/13673","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/comments?post=13673"}],"version-history":[{"count":0,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/posts\/13673\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/media?parent=13673"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/categories?post=13673"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}