{"id":19347,"date":"2025-01-24T11:24:01","date_gmt":"2025-01-24T08:24:01","guid":{"rendered":"https:\/\/www.nurolinsaat.com.tr\/timisoara-bati-cevre-yolu-tasarim-ve-yapim-isleri-projesi-imzalandi.html"},"modified":"2025-04-18T11:26:35","modified_gmt":"2025-04-18T08:26:35","slug":"le-projet-de-conception-et-de-construction-du-boulevard-peripherique-de-louest-de-timisoara-a-ete-signe","status":"publish","type":"post","link":"https:\/\/www.nurolinsaat.com.tr\/fr\/le-projet-de-conception-et-de-construction-du-boulevard-peripherique-de-louest-de-timisoara-a-ete-signe.html","title":{"rendered":"Le Projet De Conception Et De Construction Du Boulevard Periph\u00e9rique De L\u2019ouest De Timisoara A Et\u00e9 Sign\u00e9"},"content":{"rendered":"<p>Dans le cadre d\u2019un appel d\u2019offre pour le projet \u201cConception et Construction du Boulevard P\u00e9riph\u00e9rique de l\u2019Ouest de Timisoara\u201d lanc\u00e9 par l\u2019Administration Nationale pour l\u2019Infrastructure Routi\u00e8re (CNAIR) de la Roumanie et mis en concurrence le 15 mai 2024, l\u2019offre de Nurol Construction a \u00e9t\u00e9 retenu suivant une \u00e9valuation technique et financi\u00e8re. Le contrat du projet a \u00e9t\u00e9 sign\u00e9 le 23 janvier 2025.<\/p>\n<p>La dur\u00e9e de ce projet d\u2019une valeur totale de contrat de 295 251 250,09 USD, est de 30 mois, dont 6 mois de conception et 24 mois de construction. La longueur de l&rsquo;autoroute est de 13,9 km. Dans le cadre du projet, il y a 10 ponts d&rsquo;une longueur totale de 3 031 m, 4 intersections, 2 aires de stationnement et 25 km de routes de liaison seront r\u00e9alis\u00e9s. L\u2019autoroute, qui sera financ\u00e9e par des fonds de l\u2019Union europ\u00e9enne, devrait avoir un total de 4 voies, 2 voies dans chaque direction.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dans le cadre d\u2019un appel d\u2019offre pour le projet \u201cConception et Construction du Boulevard P\u00e9riph\u00e9rique de l\u2019Ouest de Timisoara\u201d lanc\u00e9 par l\u2019Administration Nationale pour l\u2019Infrastructure Routi\u00e8re (CNAIR) de la Roumanie et mis en concurrence le 15 mai 2024, l\u2019offre de Nurol Construction a \u00e9t\u00e9 retenu suivant une \u00e9valuation technique et financi\u00e8re. Le contrat du projet<\/p>\n","protected":false},"author":1,"featured_media":19343,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[62],"class_list":["post-19347","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nouvelles-a-propos-de-nous"],"_links":{"self":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/posts\/19347","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/comments?post=19347"}],"version-history":[{"count":2,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/posts\/19347\/revisions"}],"predecessor-version":[{"id":19353,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/posts\/19347\/revisions\/19353"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/media\/19343"}],"wp:attachment":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/media?parent=19347"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/categories?post=19347"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}