{"id":6471,"date":"2017-10-09T13:41:17","date_gmt":"2017-10-09T10:41:17","guid":{"rendered":"http:\/\/www.nurolinsaat.com.tr\/silifke-mut-1-kisim-yolu-projesinin-sozlesmesi-imzalandi.html"},"modified":"2018-09-07T12:57:55","modified_gmt":"2018-09-07T09:57:55","slug":"le-contrat-du-projet-de-la-route-silifke-mut-section-1-a-ete-signe","status":"publish","type":"post","link":"https:\/\/www.nurolinsaat.com.tr\/fr\/le-contrat-du-projet-de-la-route-silifke-mut-section-1-a-ete-signe.html","title":{"rendered":"Le Contrat du Projet de la \u00abROUTE S\u0130L\u0130FKE &#8211; MUT (SECTION 1)\u00bb a \u00e9t\u00e9 sign\u00e9"},"content":{"rendered":"<p>Le contrat pour la Construction de la ROUTE S\u0130L\u0130FKE-MUT (SECTION 1) entre KM:0+000-16+700 dont l\u2019appel d\u2019offre a \u00e9t\u00e9 lanc\u00e9 par le D\u00e9partement des Programmes et des Suivis de la Direction G\u00e9n\u00e9rale des Routes a \u00e9t\u00e9 sign\u00e9 entre les parties le 4 septembre 2017 et entr\u00e9 en vigueur suite \u00e0 son approbation notariale.<\/p>\n<p>Le projet situ\u00e9 dans les fronti\u00e8res de la province de Mersin comprend une route 2&#215;2 de 16.7 km au total, 3 tunnels \u00e0 double tube de 6.910 m de longueur au total, le Pont de K\u0131l\u0131\u00e7 Arslan II suspendu \u00e0 poutres en porte-\u00e0-faux avec des c\u00e2bles tendus, qui sera parmi les plus grands viaducs du monde lorsqu\u2019il sera achev\u00e9 avec une hauteur de 173 m de pyl\u00f4ne sur une fondation en caisson de 40 m et une trav\u00e9e de 410m, des ouvrages d\u2019art, des couches de fondation en b\u00e9ton de centrale, fondation en b\u00e9ton de centrale, les rev\u00eatements de m\u00e9lange chaud bitumineux, etc.<\/p>\n<p>La dur\u00e9e du projet est de 1150 jours \u00e0 partir de la livraison du site et le prix du contrat est de <a>504.589.621,61 TL<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Le contrat pour la Construction de la ROUTE S\u0130L\u0130FKE-MUT (SECTION 1) entre KM:0+000-16+700 dont l\u2019appel d\u2019offre a \u00e9t\u00e9 lanc\u00e9 par le D\u00e9partement des Programmes et des Suivis de la Direction G\u00e9n\u00e9rale des Routes a \u00e9t\u00e9 sign\u00e9 entre les parties le 4 septembre 2017 et entr\u00e9 en vigueur suite \u00e0 son approbation notariale. Le projet situ\u00e9<\/p>\n","protected":false},"author":1,"featured_media":4624,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[62],"class_list":["post-6471","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nouvelles-a-propos-de-nous"],"_links":{"self":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/posts\/6471","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/comments?post=6471"}],"version-history":[{"count":0,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/posts\/6471\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/media\/4624"}],"wp:attachment":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/media?parent=6471"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/categories?post=6471"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}