{"id":6475,"date":"2017-07-20T13:22:51","date_gmt":"2017-07-20T10:22:51","guid":{"rendered":"http:\/\/www.nurolinsaat.com.tr\/ordu-cevre-yolu-km2100-42-414784-kesiminin-ikmal-insaat-isi-projesi-sozlesmesi-imzalandi.html"},"modified":"2018-09-10T15:06:12","modified_gmt":"2018-09-10T12:06:12","slug":"le-contrat-du-projet-des-travaux-de-construction-dapprovisionnement-de-la-section-entre-km-21000-42-414784-de-la-ceinture-peripherique-dordu","status":"publish","type":"post","link":"https:\/\/www.nurolinsaat.com.tr\/fr\/le-contrat-du-projet-des-travaux-de-construction-dapprovisionnement-de-la-section-entre-km-21000-42-414784-de-la-ceinture-peripherique-dordu.html","title":{"rendered":"Le contrat du projet des travaux de construction d\u2019approvisionnement de la section entre km : 21+000 \u2013 42 + 414,784 de la Ceinture P\u00e9riph\u00e9rique d\u2019Ordu"},"content":{"rendered":"<p>Le contrat du projet des travaux de construction d\u2019approvisionnement de la section entre km : 21+000 \u2013 42+414,784 + 414,784 de la Ceinture P\u00e9riph\u00e9rique d\u2019Ordu a \u00e9t\u00e9 sign\u00e9.<br \/>\nLe projet con\u00e7u en route nationale 2&#215;2 de 21.4 km de longueur pour les travaux d\u2019approvisionnement de notre Projet de Ceinture P\u00e9riph\u00e9rique d\u2019Ordu qui est en phase d\u2019ach\u00e8vement, comprend les travaux de terrassement, des ouvrages d\u2019art, des tunnels, des couches de fondation en b\u00e9ton de centrale, fondation en b\u00e9ton de centrale, les rev\u00eatements de m\u00e9lange chaud bitumineux.<br \/>\nLe prix du contrat est de 584 millions de TL, la dur\u00e9e de r\u00e9alisation du projet est 1100 jours apr\u00e8s mise \u00e0 disposition du site.<\/p>\n<p>Nous souhaitons les meilleurs v\u0153ux pour notre pays et notre groupe.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Le contrat du projet des travaux de construction d\u2019approvisionnement de la section entre km : 21+000 \u2013 42+414,784 + 414,784 de la Ceinture P\u00e9riph\u00e9rique d\u2019Ordu a \u00e9t\u00e9 sign\u00e9. Le projet con\u00e7u en route nationale 2&#215;2 de 21.4 km de longueur pour les travaux d\u2019approvisionnement de notre Projet de Ceinture P\u00e9riph\u00e9rique d\u2019Ordu qui est en phase<\/p>\n","protected":false},"author":1,"featured_media":8449,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[62],"class_list":["post-6475","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nouvelles-a-propos-de-nous"],"_links":{"self":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/posts\/6475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/comments?post=6475"}],"version-history":[{"count":0,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/posts\/6475\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/media\/8449"}],"wp:attachment":[{"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/media?parent=6475"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nurolinsaat.com.tr\/fr\/wp-json\/wp\/v2\/categories?post=6475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}