Page 51 - Nurol YES Sustainability Report
P. 51

ENERGY CONSUMPTION                                                                                                     Our construction site area is not located within the protection   groundwater. Therefore, we are aware of the possible negative
                                                                                                                                 distances of water basin areas. However, there is a possibility of   impacts of our work and strive to eliminate them and, if not,
          Energy Consumption within      Balıkesir     Konya Eyiste    Boukhroufa      Souk Tleta                                construction activities could adversely a ect surface and   minimize them. Possible e ects can be summarized as follows:
          the Organization            Motorway Project  Viaduct Project  Dam Project   Dam Project      TOTAL
          Fuel

            Diesel (fuel, heating)       56.153,02       1.184,55       3.708,27        7.375,98       68.421,81
                                                                                                                                                            MOTORWAY RELATED CUT AND FILLING WORKS, STONE QUARRY OPERATION,
            LNG*                         3.743,87                                                      3.743,87                                             LANDSCAPE WORKS, CLEANING OF THE AREA AND SURFACE FLOWS THAT CAN BE
            CNG**                                        2.321,22                                      2.321,22                                             FORMED IN SOIL STORAGE AREAS,
          Electricity                                                                                                                                       DURING THE CONSTRUCTION, USAGE OF BITUMINOUS INSULATION MATERIALS
                                                                                                                                                            REQUIRED FOR WATERPROOFING CONCRETE SURFACE,
            Electricity Form The Grid    5.607,24       2.086,38       14.302,82        1.685,71       21.998,13
                                                                                                                                                            LEAKS-SPILLS FROM FUEL TANKS IN THE CAMP SITE,
          Total Energy Consumption (GJ)  65.504,13       5.592,15       18.011,08       9.061,69       96.485,03                                            WASTE-WATER IN CAMP SITE
                                                                                                                                                            DETERIORATION OF STREAMBEDS DURING THE CONSTRUCTION OF
          Note 1: The data of the table consists of the energy consumption of Scope 1 and Scope 2 in GHG emissions calculation methodology, in other words, the consumption of machinery and
          vehicles belonging to Nurol Construction.                                                                                                         WAREHOUSES AND PRODUCTION
          Note 2: Electric energy is used for heating purposes in Boukhroufa Dam Project, so there is no fuel consumption for this purpose. There is no heat center in Souk Tleta Dam project, thus   NATURAL DEEP SPLITTING DURING CUT EXCAVATION
          there is no fuel consumption for heating purposes.
          *LNG: Liqiufied Natural Gas          ** CNG: Compressed Natural Gas                                                                                CONSTRUCTION OF ART STRUCTURES ON HIGH LEVEL OF GROUND WATER

          GREENHOUSE GAS EMISSIONS FROM ENERGY CONSUMPTION (tCO e)
                                                                      2
          Scope      Emission Source               Balıkesir   Konya Eyiste  Boukhroufa    Souk Tleta     TOTAL
                                                Motorway Project  Viaduct Project  Dam Project   Dam Project
                                                                                                                                 Water management procedure created in the scope of terrestrial   structures are planned. Considering the e ect to prevent water flow
                     Direct Emission                                                                                             environmental management plan, to reduce the referred impacts,   during flood periods, hydraulic structures such as bridges, culverts
                                                                                                                                 defining how to work around surface water and groundwater   and diverting channels sizes were also revised. In this context, 22 box
                     Diesel Fuel Combustion Emission  3.919,182  82,675      258,817       514,804      4.775,478                resources during our construction activities. Within the existing   culverts, 4 bridges and 3 viaducts will be used for river crossing.
          Scope 1
                     LNG Combustion Emission       189,213                                               189,213                 route, considering all the dry and overflowing creek beds below
                     CGN Combustion Emission                   117.312,693                             117.312,693
                                                                                                                                 Water Withdrawal
                     Indirect Electricity Emission
          Scope 2                                                                                                                Tracking of water withdrawal and discharge will help us to measure water footprint and manage our activities more e ectively
                     Direct Electricity Consumption Emission  724,27  269,49  2.026,23      0,24        3.020,23                 Water Drawing Levels according to Source is mentioned below:
          Total Emission                          4.832,66     117.664,86    2.285,05       515,04      125.297,62

                                                                                                                                                                3
          Note 1: Data consists of the energy consumptions in Scope 1 and Scope 2 emissions for the calculation for GHG emissions, in other words, GHG emissions from machinery and vehicles   WATER WITHDRAWAL SOURCE (M )
          belonging to Nurol Construction.
                                                                                                                                 Project                          Tap water           Surface water (river, lake, etc.)  Underground water
          Operating in the construction sector; we cannot provide the GHG emission intensity of our projects, as of the fact that the production processes   Balıkesir Motorway Project  5.204,4  -                      7.986,6
          are gradual (earthworks, concrete works, etc.), di erent manufacturing types (motorway, dam, etc.) and each project and project location have
          its own characteristics.                                                                                               Konya Eyiste                         -                      144.560,0                      -
                                                                                                                                 Viaduct Project

          WATER MANAGEMENT                                                                                                       Boukhroufa Dam Project              0,0                     232.000,0                   15.945,0
                                                                                                                                 Souk Tleta Dam Project               -                       7.500,0                   14.400,0
          We spend continuous e orts and take precautions behind the   water management purposes. The depth of the wells is less than 10
          conscious consumption and e ective usage of water, which is crucial   meters, thus not subject to permission according to the groundwater
          asset for the beginning and continuation of life.     regulations. Water level is constant during the level measurements   No water resources a ected significantly by our water withdrawals in the stated amounts above for our projects. There is no water recycling in
                                                                in the well. Thus, it was concluded that there was no attraction
          Caisson wells were built due to the high groundwater level at the                                                      our project sites or HQ.
          Ertuğrul construction site, a part of Balıkesir Motorway Project; for   a ecting the water body.











           50   NUROL YES SUSTAINABILITY REPORT 2018  ENVIRONMENTAL AWARENESS                                                                                                                                                          51
   46   47   48   49   50   51   52   53   54   55   56