Page 79 - Demo
P. 79
ECOSYSTEMWATER AND WASTEWATER MANAGEMENTPerformance Indicators Details78About The ReportUn Global Compact Content IndexApplicable Gri Sector StandardGovernanceEcosystemSocialOur Sustainability ApproachPerformance Indicators DetailsPERFORMANCE INDICATORS DETAILSWater Utilisation AmountsProjectMunicipal Water (m3/year)Groundwater (m3/year)Prepared Water Supply (m3/year)Total B1070 Test Building Construction Works Project10,018.00-51.7510,069.75B557 Production and R&D Building Construction Works Project5,177.0005,177.00Boukhroufa Dam Project1,928.00530.002,458.00Souk Tleta Dam Project-1,219.17183.451,402.62%u0130zmir %u00c7i%u011fli Tram Line Project24,662.00%u00a0-4,941.0029,603.00%u00dcmraniye Ata%u015fehir G%u00f6ztepe Metro Line Project157,029.001,259.2158,288.25Balikesir Dry Pet Food Factory T%u00fcrkiye-1 Project6,397.2565.456,462.7Total 183,264.153,147.177,030.89193,442.21Amounts of Water Discharge to Receiving EnvironmentProjectWastewater SourceAmount (m3/year)Wastewater Discharge Point and MethodB1070 Test Building Construction Works ProjectMobilisation, Dormitory, Kitchen10,018.00Septic tankB557 Production and R&D Building Construction Works ProjectMobilisation, Dormitory, Kitchen5,177.00ABB Sewerage System Boukhroufa Dam ProjectCamp 1,928.00Biological treatmentSouk Tleta Dam ProjectCamp 1,219.2Septic tank%u0130zmir %u00c7i%u011fli Tram Line ProjectDomestic water4,642.90IZSU Sewerage System%u00dcmraniye Ata%u015fehir G%u00f6ztepe Metro Line ProjectDomestic and industrial157,029.00ISKI Sewerage SystemBalikesir Dry Pet Food Factory T%u00fcrkiye-1 ProjectDomestic water6,397.25Bal%u0131kesir OSB connected Sewerage SystemTotal (m3/year)186,411.32

