Page 20 - NUROL İNŞAAT TANITIM KATALOĞU EN
P. 20

Marmaray Project / İstanbul

         Marmaray Bosphorus Immersed  Tube Tunnel

         Crossing for Metro




          Location: İstanbul / TURKEY                               Total Tunnel Length: 13.5 km
          Type of Work: Immersed tube tunnel & bored tunnels under   Number of Metro Stations: 4
          sea. Bored tunnels at land sections.                      The project is carried out by a Turkish-Japanese
          Length of Immersed Tube Tunnel Under the Sea: 1.4 km      Joint Venture in which Nurol Construction was a
          Length of Bored Tunnel: 11.7 km                           shareholder.









































































          20 | Infrastructure Projects
   15   16   17   18   19   20   21   22   23   24   25