Page 38 - NUROL İNŞAAT TANITIM KATALOĞU EN
P. 38

Kürtün Dam and


          Hydroelectric Power Plant Project




          Location: Harşit River – Gümüşhane / TURKEY            The dam has two spillway tunnels, respectively 314
          Type of Work: Concrete face rock-fill dam              m and 357 m in length and 12 m in diameter, two
          Dam Body Volume: 3,200,000 m    3                      diversion tunnels that are 702 m and 742 m in length
          Reservoir Volume: 108.2 million m 3                    and 5 m in diameter. The bottom outlet tunnel is
          Installed Capacity: 85 MWe                             646 m in length and 5 m in diameter. Additionally,
          Power Plant Type: Underground power plant              9 hydraulic tunnels that are 3,852 m in total length
          (2 Francis type turbines)                              with excavation diameters varying between 4.40 m
          Annual Energy Production: 198 GWh                      and 8.40 m, as well as their final concrete covers were
          Height from Foundation: 133 m                          also completed.
          Crest Length: 380 m


































































          38 | Infrastructure Projects
   33   34   35   36   37   38   39   40   41   42   43