Page 98 - NUROL İNŞAAT TANITIM KATALOĞU EN
P. 98
FNSS Research and Development Building
• Location: Ankara / TURKEY • Type of Work: Turnkey Building
2
Construction • Total Construction Area: 6,000 m • The project
comprised of the turnkey construction of Research and Development
Building of the existing FNSS Defence Systems Complex.
Nurol Technology, Industry,
and Mining Trade Co. Inc. Şaşmaz Plant
• Location: Ankara / TURKEY • Type of Work: Turnkey construction of
industrial facilities and administrative buildings as well as installation
of electromechanical equipment • Closed Area: 2,800 m² • The project
included the turnkey realization (including the engineering works) of
mine processing plant.
Nurol Printing and Packaging Industry Co. Inc.
Manufacturing Facilities
• Location: Sincan - Ankara / TURKEY • Type of Work: Turnkey
construction of printing and packaging facilities along with all
auxiliary and administrative units • Closed Area of Facility: 3,200
m² • The facilities, which were completed in a very short time
period of 5 months on turnkey basis, are equipped with computer
and automation systems of the latest technology for design and
manufacturing purposes.
Sivas Iron and Steel Plant
• Location: Körtuzla - Sivas / TURKEY • Type of Work: Turnkey
realization of main units comprising of a rolling mill and arch
chambered steel mill and of auxiliary units and social buildings
including fuel stations, workshop, warehouse, repair shop, water
preparation and cooling plant of 12,300 m³/hour capacity, oxygen
plant of 2,000 Nm³ capacity, waste water treatment plant of 500
m /day capacity, central heating unit, administrative and service
3
buildings, relevant infrastructure and landscaping works, lodgings,
shopping centers, primary school, clubhouse, mosque, guesthouse
etc. • Closed Area of all Manufacturing Plants: 80,000 m² • Rolling
Mill Capacity: 400,000 tons/year • Steel Mill Capacity: 450,000 tons/
year liquid steel • In addition to the above-listed works, realization of
connection roads and 17 km long railway line were also included within
the project scope. The amount of manufactured and installed steel
structure reached up to 10,000 tons.
98 | Industrial Plant Projects