Baku-Tbilisi-Ceyhan Oil
Pipeline Project, Steel/Piping
Works, TURKEY
The total length of the project is
1.774 km of which 1.074 km is in
Turkey. The portion of works under
the liability of Nurol Steel (100%
Nurol company) is comprised of the
tanks, steel structures and piping
works of 4 pumping stations and 2
pigging stations constructed along
the pipeline laying in Turkey.