Emirates Engineering Center

         Aircraft Hangar, Dubai/UAE










                                    One hangar is

                                    approximately composed
                                    of;
                                    2.000 tons of steel,

                                    100.000 nuts,
                                    20 km long welding,

                                    300.000 holes
                                    7.000 elements.







         Using of HISTAR steel, all joints being slip
         critical joints, fabrication of the construction

         in Ankara’s cold weather by considering the
         erection difficulties and 108 meters Mega
         Truss deflections to be caused by the hot
                                                                             Facade Truss’ big dimensions like 500 tons and 110 meters span, erection of this truss in one step,
         weather in Dubai.The works have been
                                                                             working of the 50 tons Monorail Cranes in 100 meters span length, critical paint procedures due to
         completed within a period of 14 months.
                                                                             Dubai’s humidity and climate, and torsioning of all 10,9 nuts according to DIN 18800 are the
                                                                             significant properties of this Hangar, which make it very rare in the world.