Page 55 - Nurol YES Sustainability Report
P. 55

ENVIRONMENTAL AWARENESS


        As Nurol Construction, we manage environmental impacts arising   Making a positive contribution to UN’s sustainable development goals   results in the Sustainability in Value Chain Management section of our   Every day, we plan trainings to increase the competence of our teams,
        from our activities, and implement various applications in order to   determined in order to eliminate the urgent and important   report.                                     and ensure their participation in e ective seminars and meetings on
        protect the environment and respect nature. As an integral part of our   environmental problems facing our world constitutes the basis of our   We develop waste management plans in line with the principle of   sustainability issues. We employ environmental engineers and
        culture, we care and support environmental sustainability.  sustainability strategy. For this reason, clean water and sanitation,   cradle to grave in all locations where we operate, and we include our   environmental o cers in our teams. However, our point of view in this
        We undertake that we aim to protect the environment in every are we   accessible and clean energy, sustainable cities and communities plus   subcontractors in these works to ensure the proper disposal of our   regard is to bring this awareness to all our employees, not only to our
        operate with our “Environmental Policy”, and we work in compliance   climate action are among the most important goals we focus on.  waste. We adopt a life cycle perspective in waste management and   relevant teams. For this reason, we strived to implement projects on
        with this policy.                                                                                                      we manage waste, starting with the mobilization process, including   environmental awareness issues in 2019. In particular, reducing waste
                                                                                                                               the warranty period of our projects. We create the waste water   consumption, water  and energy saving were among our priority
                                                                                                                               management infrastructure before our activities begin, and we   issues.
                                                                                                                               determine our methods for the disposal of waste water according to   We have not been subject to any significant sanction or penalty by the
                                                                                                                               the facilities of the location of the project. While organizing waste   Provincial Directorate of Environment and Urbanization or other/local
                                                                                                                               management works, we carry out works in accordance with the waste   administrations due to a non-compliance with environmental
                                                                                                                               hierarchy, and manage it in accordance with zero waste principles. We   legislation in 2019. During our audits, we have found out no suppliers
                                                                                                                               continue our work with an understanding that can contribute to the   that had significant negative impact on environment.
                                                                                                                               circular economy.                                      In our Balıkesir Motorway Project, the amount of monetary penalty
                                                                                                                               According to our corporate culture, we believe that one of the most   determined by Dolsar Company, which conducts audits on behalf of
                                                                                                                               important steps in our environmental management system is to   the Principal Lenders, after the environmental and social audit reports
                                                                                                                               increase the consciousness and awareness of our employees on this   for 2019 due to articles of nonconformity of subcontractor activities is
        In all our projects, we determine and manage our environmental   legal We have not been subject to any significant sanction or penalty   issue. We endeavor to create competent teams to carry out and   $7.500.
        aspects with a proactive approach in order to reduce or completely   by the Provincial Directorate of Environment and Urbanization or   improve environmental practices in our headquarter and projects.
        eliminate the environmental impacts caused by our activities. By   other/local administrations due to a non-compliance with   ENVIRONMENTAL TRAININGS
        determining the potential environmental  impacts that may  occur   environmental legislation in 2019,. During our audits, we have found
        depending on these environmental aspects, we designate the   out no suppliers that had significant negative impact on environment.  Increasing the environmental awareness and consciousness of our   trainings especially focus on how our employees can contribute to the
        appropriate control methods for these e ects. We control our   In our Balıkesir Motorway Project, the amount of monetary penalty   employees and stakeholders that we work with will ensure that our   reduction  of  waste  and  what  they  can  do  about  water  and  energy
        environmental impacts by developing activity plans for which   determined by Dolsar Company, which conducts audits on behalf of   corporate culture in this regard is further developed, and that   savings. In our projects, trainings are given on environmental risks and
        responsibilities and deadlines are set. Natural resource consumption,   the Principal Lenders, after the environmental and social audit reports   environmental sensitivity is reflected more e ectively in our way of   precautions, environmental legislation, waste management, disposal
        soil, water, air pollution, environmental dust,  pollution from noise,   for 2019 due to articles of nonconformity of subcontractor activities is   doing business. For this reason, we attach great importance to the   of chemical substances, environmental management in emergencies,
        chemical consumption, waste production, greenhouse gas emission,   $7,500. requirements and standards through corrective action   environmental education process and try to increase the   environmental accidents in addition to job-specific trainings.
        natural disasters, and e ects on flora and  fauna are among our   systematics. We  are  working to  carry out  corrective actions that   environmental awareness of our projects day by day. We also   Alongside the responsibilities arising from our reporting process in
        environmental dimensions stemming from our activities. We consider   prevent the recurrence of the findings by reaching the root causes. We   encourage our subcontractors and suppliers, who have significant   2019, sustainability trainings have been our priority. Trainings have
        all our environmental aspects pointed out by legal requirements as   also include issues that we think will create improvements in audits,   e ects on our environmental performance, to participate in these   been organized for senior management in order to raise awareness
        important and apply the necessary control methods regarding these   and we plan to carry out activities on the issues we have identified as   works. We regularly monitor the environmental trainings of our   about the environmental conditions that our stakeholders demand
        dimensions. We update the “Environmental Aspects Risk   opportunities for improvement. We have encouraged all our projects   subcontractors through follow-up tables, and support them in this   from us, and these trainings are targeted to be increased in the
        Assessment” study, which we regularly review, in accordance with the   for improvement e orts by including the goal of preparing an   regard if needed.                      coming years. In 2019, 1252,75 person.hours of environmental training
        activities and current situation.                     environmental improvement report in our 2019 annual target       Annual training plans are prepared with the training needs analysis   was provided in our reports and our headquarter.
        As Nurol Construction, we manage the Environmental Management   programs to increase environmental improvement works. In addition,   we have conducted in our headquarter and projects. Environmental   In  our  projects,  our  subcontractors  are monitored  through  daily,
        Systems Management, which we have established in line with ISO   according to the scale of the project, environmental trainings,   trainings are organized in accordance with the training plans. The   weekly field tours and 2  party audits. The findings are followed up
                                                                                                                                                                                                       nd
        14001: 2015, according to the principle of continuous improvement,   environmental field tours, organizing meetings with subcontractors   foundation of our environmental trainings is built on waste   according to the corrective action systematic, and in case the
        while fulfilling the legal requirements in the countries where our   on environmental issues, planning second-party audits on   management and environmental awareness trainings given to our   nonconformities are not remedied, warnings are given with an o cial
        projects are located. In cases where the legal requirement in a   environmental issues are included in the 2019 target programs. In this   newly employed personnel within the scope of orientation. These   letter , subject to administrative fines when necessary.
        pertaining country has expectations lower than  our system   context, we have begun to hold quarterly meetings on environmental
        requirement, we continue to implement environmental management   issues in all of our projects, and the topics in the environmental
        systems as a minimum. In line with our sustainability policy, we strive   heading in the project are followed through these meetings.
        to minimize environmental damage with a proactive approach in all   We took important steps  in 2019 to improve subcontractor   ENVIRONMENTAL TRAININGS GIVEN IN 2019 CONSIST OF 1.253 PERSON.HOURS.
        our processes. Therefore, we follow the changes in environmental   performances, which have a major impact on our environmental
        legislation and take our measures in accordance with the change. We   performance.  We plan  audits  and  review  their
        conduct centralized up-to-date follow-up of legal                  environmental performances in order to ensure that   ENVIRONMENTAL TRAINING HOURS - 2019
        requirements, provide information to all our teams                 our subcontractors and suppliers we work with are
        in our projects on these issues and make                           able to monitor their environmental impact. We fully                                         Total Training Hours               Training Hour Per Employee
        suggestions on how to implement the practices.                     control the compliance of the companies we work                                               (employee.hour)                       (hour/employee)
        Apart from legal and standard requirements, taking                 with with legal requirements and support them with
        into account the expectations of our stakeholders in               knowledge and experience to complement their        Environmental Trainings
        our projects, we also include our stakeholders in our              shortcomings.  In  2019,  we  increased  our        HQ                                            158,5                                  2,46
        management system if our stakeholders have                         second-party audits and started to expand our audit
        environmental expectations.                                        teams so that they could be carried out in all our   Balıkesir Motorway Project                   250,75                                 1,21
        We review our management system through                            projects. We have extensively provided the          Eyiste Viaduct Project                         120                                   1,37
        internal audits that we carry out periodically, and                information about the audits we conducted for our   Boukhroufa Dam Project                        462,5                                  2,05
        follow up the environmental findings identified with                 subcontractors and suppliers and respective 2019
                                                                                                                               Souk Tleta Dam Project                         261                                   1,15


         54   NUROL YES SUSTAINABILITY REPORT 2019                                                                                                                                                             ENVIRONMENTAL AWARENESS  55
   50   51   52   53   54   55   56   57   58   59   60