Page 10 - Nurol YES Sustainability Report
P. 10

ABOUT NUROL CONSTRUCTION





                                                                                                                               As a result of it’s global contributions to construction and contracting   most important part of the project, is the second longest bridge in
                                                                                                                               sector, Nurol Construction (Nurol Construction and Trading Co. Inc.)   Europe and the fourth longest bridge in the world with it’s 1.550 m
                                                                                                                               with its deep-rooted company culture and experienced sta  earned   central span and total length of 2.907 m including its connection decks.
                                                                                                                               many reputable references and successfully completed infrastructure   The 1.372 m-long Southern Approach Viaduct that connects the
                                                                                                                               projects for motorways, bridges, viaducts, tunnesl and dams as well as   southern piers of the Osmangazi Bridge to the motorway contains a
                                                                                                                               superstructure projects for industrial facilities, hotels, shopping malls   total of 33.000 tons of steel, and set a world record in the quantity as
                                                                                                                               and residentials.                                     the first 22.500-ton steel structure to be completed through the
                                                                                                                               The company is a member of Nurol Group Companies. The main   incremental launching method at a length of 1.123 m, while a Turkish
                                                                                                                               shareholder is ‘Nurol Holding A.Ş.’, and it is controlled by ‘Çarmıklı’   record was set when the last deck weighing 2.600 tons was hoisted
                                                                                                                               family members. It was established in 1966 in Ankara and moved its HQ   into position.
                                                                                                                               to Istanbul in 2015. It contributed to agriculture and heavy industry   Starting our construction journey in North Africa with Algeria, we
                                                                                                                               with irrigation and turnkey industrial plant projects during the   expanded to Morocco. In this are, we are running infrastructure projects
                                                                                                                               establishment period. Utilizing e ective and innovative technology in   such as dams, bridges and motorways.
                                                                                                                               all projects, in 1976, Nurol Construction became a pioneer in the sector   Gulf countries have a crucial role in overseas activities of Nurol Group
                                                                                                                               with Ayas Tunnel project by implementing New Austria Tunneling   Companies.
                                                                                                                               Method technology in Turkey for the first time ever.   Within the scope of ongoing projects in UAE, under the employership
                                                                                                                               Dedicated to applying proper architectural and engineering solutions in   of leading investors of the region, total residence construction area
                                                                                                                               line with contemporarynecessities at all times and in all projects, Nurol   built in scope of satellite towns exceeded 500.000 m . Infrastructure
                                                                                                                                                                                                                             2
                                                                                                                               Construction completed satellite town and luxury estate projects which   and technological steel construction projects were added to our
                                                                                                                               have been globally and locally appreciated in terms of design and   references as well.
                                                                                                                               quality.                                              Furthermore, in Abu Dhabi, we conduct sea bridge connections and
                                                                                                                               The nearly completed Ilısu Dam and Hydro-Electric Power Plant project   canals, various infrastructure projects for bridges and tunnels and
             OUR REPUTATION STEMMING FROM OUR HISTORY OF OVER 50                                                               it is Turkey’s second largest dam with 11 billion m  reservoir, 1.200 MW   luxury hotel and residence building projects.
                                                                                                                                                                   3
                                                                                                                               installed capacity and annual 4,1 billion kWh energy production   Nurol Construction  proudly appears  in  ‘ENR  World’s  Biggest
                    YEARS HAS BEEN BUILT ON QUALITY AND TRUST. OUR                                                             capacity. The dam will contribute to reduction of Turkey’s energy   Contractors List’ for the last fifteen years.
                                                                                                                               deficit.
          COMMITMENT IS; TO DELIVER ALL PROJECTS FAULTLESSLY AND ON                                                            Bosphorus Tube Tunnel Crossing Project (MARMARAY) connected two   NUROL Real Estate Investment Trust Inc., which stands out with it’s
                                                                                                                                                                                     significant investments among other companies of our Group of
           TIME, TO PROVIDE STRONG AND QUALIFIED OUTPUT, TO PRODUCE                                                            sides of İstanbul by utilizing cutting edge technology  with a railway   Companies that serves in the construction and contracting sector,
                                                                                                                               line 60 meters under sea level.
                           THE MOST RELIABLE GOODS AND SERVICES.                                                               Nurol Construction completed projects making Turkish citizens proud   continues residential  and o ce  projects in Istanbul  (NUROL Park,
                                                                                                                                                                                     NUROL Tower, NUROL Life) and transfers it’s experiences in land
                                                                                                                               using latest technology, design-oriented engineering solutions and   development, project design, construction and marketing to the sector.
                                                                                                                               %100 local labor force.                               Following the IPO in 1999, Nurol Real Estate Investment Trust Inc
                                                                                                                               As the largest Build-Operate-Transfer Project in the history of the   quoted on the Istanbul Stock Exchange.[A1]
                                                                                                                               Republic of Turkey with a total value of $7,5 billion, the   Nurol Construction’s ongoing and completed projects total value is
            DETALIED            Nurol Construction Ongoing Projects:  https://www.nurolinsaat.com.tr/en/ongoing-projects       Gebze-Orhangazi-Izmir Motorway reduced travelling time between   approximately US $25 billion.
            INFO                Nurol Construction Completed Projects:  https://www.nurolinsaat.com.tr/en/completed-projects   Istanbul and Izmir from 9 to 3,5 hours. The Osmangazi Bridge, as the






                    Total                     Net                      Total                     Total                                                                         ÇARMIKLI
                 Employment                   Sales                Project Amount           Construction Area                                                             Family Members        NUROL Holding
                 +11.000                     4,20                       25                       3,6                          ORGANIZATION                                      %0,10           %99,90
                   Employees                 Billion TL                $ Billion                Million m 2                                                                   Capital Share     Capital Share
                                                                                                                                                                                467.000         445.004.000
                    Total                     Total                    Total                   Villa and                                      PERSON
               Road Construction          HEPP Capacity          Tunnel Construction            Housing
                  1.500                     1.900                      110                    14.000
                     Km+                      MW+                       Km+                      Piece+






         10   NUROL YES SUSTAINABILITY REPORT 2019                                                                                                                                                                   CORPORATE PROFILE  11
   5   6   7   8   9   10   11   12   13   14   15