Page 22 - Nurol YES Sustainability Report
P. 22
PROJECTS:
ON-GOING AND OUT OF THE SCOPE OF REPORT
GEBZE – ORHANGAZİ – İZMİR MOTORWAY PROJECT YEŞİLYAKA PROJECT
As per the Implementation Contract signed on centers, 3 tunnel operation and maintenance Yeşilyaka project consist of construction of villas, social facility, sales o ce and trading area, around Büyükçekmece Sırtköy district on
2
27 September 2010 between the General centers and 18 motorway service facilities. In 1.008.732 m land.
Directorate of Motorway and Otoyol Yatırım ve the project Gebze - Orhangazi - İzmir Motorway For the Yeşilyaka Project Mesa-Nurol Joint Venture established. Expected project completion: 2022.
İşletme A.Ş., which became e ective on 15 (including Osmangazi Bridge and Access
March 2013, 384 km of motorway and 43 km of Roads), which is one of Turkey's largest ÜMRANİYE ATAŞEHİR GÖZTEPE METRO PROJECT
access road, adding up to a total of 427 km of Build-Operate-Transfer modelled infrastructure Under the scope of Ümraniye-Ataşehir-Göztepe Metro Line Project which was secured and signed with İstanbul Municipality on 2017, construction
motorway will be constructed to connect Gebze investments, Gebze Junction-Bursa interstate of 13 km long double tube TBM tunnel, 2 train depots (NATM) and connection tunnels (NATM) is being implemented. Project includes total of 11
and İzmir. The Gebze İzmir Motorway route motorway segment including the Osmangazi stations distributed as 5 main shaft+tunnel type, 4 cut and cover type an 2 tunnel type stations. Once completed, project will connect three
comprises construction of Izmit Bay Crossing Bridge was completed and opened to tra c on district at Anatolian side of İstanbul.
Suspension Bridge, 29 viaducts, 3 tunnels, 199 07.01.2016 and the motorway section between For this project, Gülermak-Nurol-Makyol Joint Venture established. Expected project completion: 2023.
motorway bridges, 20 toll plazas, 25 Bursa and İzmir on 04.08.2019.
interchanges, 6 operation and maintenance SUPPLEMENTARY WORKS OF ORDU RING ROAD PROJECT
Within the scope of the project undertaken by Nurol-Yüksel-YDA-Özka Joint Venture, it is aimed to complete the remaining works of Ordu Ring
Road Project. Expected project completion: 2023.
PTO TİZİ OUZOU BOUIRA
INTERSECTION MOTORWAY - PTO PROJECT SİLİFKE-MUT ROAD PROJECT
The 48 km long connection motorway between Tizi Ouzou-Bouira in Algeria is operated by the Within the scope of the Silifke-Mut Road Project under the responsibility of Nurol Construction, 14,2 km long 2x2 lane motorway together with
Özgün-Nurol Partnership, and within the scope of the project, 48 km of motorway, a total of 2 x 1.670 tunnel and engineering structures will be realized. 6.870 meters length of double tube road tunnel and 410 meters long cable-stayed and
meters of double tube tunnel, 21 viaducts, and other structures, infrastructure and drainage system balanced cantilever beam Kılıçarslan II Bridge method) are also under the scope of the project. Expected project completion: 2023.
manufacturing will be completed. The section of the project between km: 0 + 000-10 + 000 has been ILISU DAM AND HEPP PROJECT AND HASANKEYF GROUP BRIDGES PROJECT
opened to tra c, and the remaining parts are being constructed.
Expected project completion: 2025. Ilısu Dam and HEPP project is located on the Tigris River and is being implemented under Nurol – Cengiz Joint Venture. Concrete-face Rockfill type
dam body has a volume of 27,76 million m , and the annual energy production of the power plant with an installed capacity of 1.200 MWh is 4.120
3
In 2019, for the project: In the project as of the end of 2019, total: GWh. The height of the dam from the foundation is 131 m and the maximum water level is 528,87 m. The planned completion date of the project
• 1.163.314 m cut excavation • 16.445.455 m cut excavation is June 2020.
3
3
• 864.426 m filling works • 3.226.041 m filling works Construction of 465 m long Hasankeyf-1, 1.001 m long Hasankeyf-2 and 169 m long Başur bridges in Siirt and Batman provinces, which was
3
3
• 64.758 m reinforced concrete • 310.717 m reinforced concrete undertaken by Nurol – Cengiz Joint venture in 2013, is expected to be completed on June 2020.
3
3
• 101.636 m tunnel excavation • 629.610 m tunnel excavation
3
3
• 53.577 m tunnel pavement concrete prod. • 444.021 m tunnel pavement concrete prod. UNITED ARAB EMIRATES PROJECTS
3
3
• 33.116 tons of superstructure cold mix prod. • 236.211 tons of superstructure cold mix prod.
• 89.944 tons of superstructure hot mix • 455.530 tons of superstructure hot mix Nurol U.A.E. was established on April 2003 in Abu Dhabi, the capital city of the United Arab Emirates as a local company. Dubai branch was opened
in 2004. The main purpose of the company is to evaluate the potential in the construction sector in the region and operate in voluminous projects.
production completed. production completed.
Ongoing projects of Nurol UAE in Dubai and Abu Dhabi by end of 2019 are as below:
YUSUFELİ DAM BRIDGES PROJECT
Corniche Tower Building Project P32 Parcel Dubai Gulf Building Project
Yusufeli Dam Bridges Project has been undertaken by Nurol-Gülsan Partnership in 2017, Located in Abu Dhabi, with total construction area of 67.000 m , it Located in Dubai, construction of twin towers including 471 residences
2
and 4 balanced cantilever type bridges will be constructed on Yusufeli (Artvin-Erzurum) consists of construction of tower including commercial, o ce and will be completed.
Dist. State Road. The bridges consist of 530 m long Şilenkar Viaduct, 644 m long residence sections. Expected project completion: June 2020.
Tekkale (Hazuket) Viaduct, 695 m long Yusufeli Viaduct and 340 m long Yusufeli Dam Expected project completion: May 2020.
Viaduct. Expected project completion: 2022. P20 The Cove Dubai Gulf Building Project GA14 Golf View Villas Project
Located in Dubai, total construction area is 76.000 m , and Located in Dubai, construction of 204 villas will be completed.
2
3 residence buildings are being constructed.
In 2019, for the project: In the project as of the end of 2019, total: Expected project completion: June 2020.
3
• 31.950 m cut excavation • 309.789 m cut excavation Expected project completion: July 2020. Beach Vista Residential Towers Project
3
• 33.586 m bolt production • 67.699 m bolt production GA09 Golf View Apartments Building Project Located in Dubai Harbor, residential towers (2) will be completed
• 8.664 m barbican production • 21.975 m barbican production Within the scope of the Project in Dubai, there are 2 residential by 2021.
• 317 tons of steel mesh rebar prod. • 570 tons of steel mesh rebar production buildings consisting of 288 units and 14 detached apartments. Expected project completion: April 2021.
• 21.632 tons of shotcrete production • 44.040 tons of shotcrete production Expected project completion: April 2020.
• 480.130 m cut excavation • 941.307 m cut excavation
3
3
• 2.044 m plain concrete production • 2.496 m plain concrete production
3
3
• 14.329 tons of reinforcement working • 12.338 tons of reinforcement working
• 67.919 m reinforced concrete • 71.481 m reinforced concrete
3
3
production completed. production completed.
22 NUROL YES SUSTAINABILITY REPORT 2019 CORPORATE PROFILE 23