When we examine the water withdrawal data, our water withdrawal data in 2019 is less than in 2018. Depending on the intensity of our activities,   Konya Eyiste Viaduct Project  Boukhroufa Dam Project   Souk Tleta Dam Project
        our water draft di ers in our projects. Surface waters are generally used for our site work and groundwater wells are preferred for use in camp
                                                                                                                                                                                 3
        sites. We also have a project that utilizes surface water in camp sites.                                               In the Konya Eyiste Viaduct Project, the   In 2019, 38.385 m  of water was used in our   In our project camp site, a total of 16.200 m   3
                                                                                                                               amount of water used in the camp site is   project in the camp site. We have increased   water use have been carried out, and
                                                                                                                                      3
                                                                                                                               18.073 m , and with the water consumption   the number of awareness raising activities on   water-saving measures have been taken in
                                                 WATER  WITHDRAWAL (m )                                                        measures we have taken, there is a 4%   water use. The amount of water used for   the following manner.
                                                                           3
           300.000                                                                                                             reduction in water consumption compared to   filling material and concrete irrigation has       Utilizing of water saving systems.
                                                                                        Water Withdrawal in 2018               last year.                          decreased by 28% compared to the previous
           250.000                                                                                                                                                 year and the water used for concrete plant       Saving by designating a single area for
                                                                                        Water Withdrawal in 2019                   We provide instructions to our employees                                the car wash system.
           200.000                                                                                                                                                 has decreased by 2%.
                                                                                                                                 to prevent unnecessary water                                               Storage of drinking water in suitable
            150.000                                                                                                              consumption.                           To meet the water requirement of the   environment and consumption for the
            100.000                                                                                                                We try to minimize losses by responding   crusher facility, a creek was built on the   main purpose.
                                                                                                                                                                      stream bed, and after the water
                                                                                                                                 quickly in case of failure.                                                We create awareness among our
            50.000                                                                                                                                                    accumulated in the crate was used in the
                                                                                                                                   Thanks to the fact that there is water   crusher facility, the suspended materials   employees through trainings on the
                0                                                                                                                installation in all areas of the camp site,   collapsed by resting in the pool in front of   conscious use of water.
                     Balıkesir Motorway Project  Konya Eyiste Viaduct Project  Boukhroufa Dam Project  Souk Tleta Dam Project    we use packaged water only as drinking   the spring co erdam. This rested water is       We have warning signs in places where
                                                                                                                                 water.                               used again for irrigation of roads and   there is water use in order to prevent
                                                                                                                                                                      injection drills with its body filling. In this   unnecessary use of water.
                                                                                                                                                                                        3
                                                                                     1%                                                                               way, we save a 172.200 m  of water taken
                                                                                                                                                                      from the creek Boukhroufa of 200.000 m   3
        In our projects, we are withdrawing from surface waters at a high rate and groundwater   18%                                                                  reusing it.
        is also among the resources we use extensively.                                             Tap Water                                                           We inform our employees about water
                                                                                                    Surface Water                                                     conservation in environmental
        No water resources a ected significantly by our water withdrawals in the stated              (river, lake, etc.)                                               information trainings we provide.
        amounts above for our projects. There is no water recycling in our project sites or HQ.     Underground Water
                                                                                        81%
                                                                                                                               Waste-Water Management

        E orts Behind Water Consumption Decrease                                                                               Depending on the infrastructure in the regions where we operate,   mentioned under the heading Waste Management. If we mention
                                                                                                                                                                                     briefly here; in our Balıkesir Motorway Project, “Spill Response Sets”
                                                                                                                               domestic waste water disposal methods are determined at the
                                                                                                                               planning stages  of our projects, and domestic waste water is   were provided containing absorbent materials suitable for the
        We take measures for the conscious use of both drinking water and potable water in our projects, and we produce various solutions according to   transferred to the sewage system in the regions with the appropriate   materials to be intervened directly on site. They were kept in safe and
        the opportunities at the locations where we operate to reduce water consumption. In our activities with intensive water use, we take special care   infrastructure. In areas where there is no sewage system, we use a   clearly marked locations and trainings were provided to employees for
        to reduce water consumption and periodically check the amount of water consumed. Although there is no water source that is significantly   septic tank application or treatment system depending on the   the usage of sets. In addition, all employees and subcontractors are
        a ected by our water withdrawals in our projects, the saving measures taken are listed below.
                                                                                                                               number of employees envisaged to stay in the camp.    obliged to report any environmental incidents. Environmental cases
        Our Balıkesir Motorway Project                                                                                         In our projects where there is no proper sewage system, we obtain the   examined and necessary precautions and actions are taken.
                                                                                                                               permissions from the legal authorities and install septic tanks. The   Environmental teams were set up to respond in case of any
                                                                      3
        The amount of water used in the camp site in Balıkesir Motorway Project is 13.375 m  for 2019 and it is 65,7 m  for drinking water. The following   septic tanks are constructed as leak proof to eliminate the   environmental accident related to waste water happened in our Konya
                                                                                        3
        measures have been taken to save water.                                                                                environmental impact and are checked by the authorized institution   Eyiste Viaduct Project and trainings and drills were organized for
                                                                                                                               for the leak proof after installation. Waste water disposal protocol is   measures. Environmental kits are provided for use in situations such
                                                                                                                               made with the institutions that will discharge the wastewater in our   as spill-scattering. In similar cases, subcontractors also have
            Leakage monitoring through regular controls of water       Creating a saving awareness via warning signs.          region, and in accordance with the protocol, the wastewater is sent to   equipment and teams that can intervene in the same way. In case of
          consumption (i.e., determination of water leaks in pipes by       By improving the storage conditions of the packaged water we   the discharge area at regular intervals by means of a vacuum truck.   an environmental accident, the subcontractor has an obligation to
          comparing consumptions).                               use, we ensure its use without losing the quality of drinking   Withdrawal receipt records are kept for each shot. After the   make a verbal notification within 2 hours and a written notification
            We quickly fix faults that will increase water consumption.  water. In this way, we prevent the formation of waste drinking   withdrawal, we also obtain information about the areas where the   within 48 hours.
            Shower heads and taps frequently controlled by camp supervisor   water by ensuring that the products are used as long as their   vacuum truck casts, and we examine its environmental compatibility.  In accordance with the contract made with the subcontractor in our
          to prevent water leaks.                                shelf life.                                                   In accordance with the legal regulations, in case the number of   Boukhroufa Dam Project, it is responsible for immediately reporting
            Savings through ensuring that washing machines are used only       Thanks to high standards of construction sites, we prevent the   personnel staying in the camp is not suitable for septic tanks, package   all damages, including environmental pollution, to the Contractor due
          by authorized persons with the selection of the economic   consumption of packaged water for utility purposes by reaching   treatment systems are installed. We carry out periodic checks of   to their work, and is responsible for all damages. In this context,
          programs of the machines,                              every point in the site area and also reduce the generation of   these systems,  and  perform their maintenance  and  breakdowns   sub-contractors were informed about this issue.
                                                                 packaging waste.                                              without delay.                                        In the Souk Tleta Dam Project, our personnel and subcontractors were
            Ensuring e ective water consumption by switching to drip water
          system in the construction sites hobby gardens.         We also reduce our water consumption by raising our employees’   Prevention of spillage-scattering and the corrective interventions in   informed about what to do in case of any leakage related to
                                                                 awareness thereof.                                            cases where it prevented the other dimensions of our waste water   wastewater. In case of environmental accidents, subcontractors were
                                                                                                                               management. In this context, applications in our projects are   notified about the project management and OHS-E teams urgently.