Page 62 - Nurol YES Sustainability Report
P. 62

WATER DISCHARGE BY RECEIVING ENVIRONMENT                                                                               is possible, and we contact the licensed companies                 We are using this system in waste disposal
                                                                                                                               for recycling and disposal processes. In cases where               processes by transitioning to the “Waste
        Project                   Waste Water Source    Quantity (m /year)       Wastewater Discharge Point and Method         licensed institutions are not available according to               Management Application/Motat” system created by
                                                                 3
                                                                                                                               country conditions and legal regulations are not                   the Ministry for the delivery of our hazardous waste
                                  Ertuğrul Construction Camp Site  10.950  Üzümcü Stream/Biological Wastewater Treatment System  available,  we  contact  organizations  that  will               in 2019.
        Balıkesir Motorway Project                                                                                             organize the most environmentally friendly disposal
                                  Kızılören Construction Camp Site  2.670        Manisa Sewage System/Biological Wastewater                                                                       We   inform  our  employees  about  waste
                                                                                                    Treatment System           process. In the process of hazardous waste disposal,               management in recruitment training and general
                                                                                                                               we work diligently and dispose of it in compliance                 environmental training. We provide tool-box
                                                                            No waste water discharge to the receiving environment.
        Konya Eyiste Viaduct Project  Camp Site Domestic Use  1.220                                                            with legal requirements.                                           trainings for our personnel working in our machinery
                                                                              Septic withdrawal is conducted with a vacuum truck.
                                                                                                                               In our projects, we have Temporary Waste Storage                   supply facilities, especially on the fields, for our
                                                                                   After biological process, it is directly given to
                                  Construction Camp Site     38.385                                                            Facilities where our waste will be stored temporarily              hazardous wastes released daily, weekly.
                                                                                                   Boukhroufa Stream.
        Boukhroufa Dam Project                                                                                                 before being given to disposal companies.                          In 2019, we contributed to circular economy works
                                                                         After the sedimentation pool, water is reused or supplied to   Temporary storage areas have been built in    with our new applications. In this context, in order to reduce the use
                                  Stone Crusher              21.600
                                                                                          Boukhroufa Stream with free flow.     accordance with the legislative requirements and separate storage   of plastic bottles in the headquarter, we started using the dispenser
                                                                                                                               areas have been created for each waste. Waste areas are named and
        Souk Tleta Dam Project    Construction Camp Site     16.200                      With sewage system and attraction                                                            for drinking water and started using the dispenser in each section.
                                                                                                                               summary material safety forms for chemical wastes are hanged in the   Thus, we prevented the use of approximately 30.000 plastic bottles
                                                                                                                               areas. In case of any leakage-spillage, environmental kits are available
        Water Bodies A ected by Water Discharges                                                                                                                                      annually. Through this work, we endeavored to influence the choices
                                                                                                                               at the facility for intervention. Fire extinguishers are located against   they make in their daily lives by creating a serious awareness about
        When we examine the water bodies that will be a ected by flowing or   discharge to the water bodies. In accordance with the protocol made   emergency situations. Authorized personnel have been assigned for   the use of plastic bottles in our employees. We strived to encourage
        the water we discharge within the scope of our projects;  with the municipality of the region, withdrawal is done regularly with   temporary waste storage facilities and trainings on waste   our headquarter employees to avoid using plastic bottles in their daily
        In our Balıkesir Motorway Project, Ertuğrul Construction Site, which is   a sewer truck. During the camp set-up phase, infrastructure has been   management have been provided. We also control the waste areas of   lives by giving them thermos. We also provided employees with
        our main camp site, a package wastewater treatment plant has been   established to collect all domestic wastewater at the same point,   our subcontractors within this scope, and support our subcontractors   information that will raise awareness on this issue, by encouraging
        set up, which is sized according to the number of persons available,   including our subcontractors within our camp site. The septic tank   regarding the possibilities when necessary.   bilateral use to prevent unnecessary outcomes in the o ce.
        and the treatment plant operates on the principle of biological active   where domestic wastewater is delivered has been built in accordance
        sludge. According to the Water Pollution Control Regulation, waste   with legal regulations and has a leak proof report. There is a sealed
        water samples taken in regular periods are analyzed through   septic tank in the camp site of our subcontractor where we supply
        accredited laboratories. In our Kızılören facility, connection has been   ready mixed concrete. We follow the regular withdrawal records.   IN OUR NUROL CONSTRUCTION HEADQUARTERS, WE SWITCHED TO
        provided to the existing sewage system with legal authority   Our Boukhroufa Dam Project has a package biological treatment
        permissions. In our project, sealed septic tanks and sewerage   facility depending on the number of employees. Although necessary   “WATER DISPENSER” FOR PLASTIC WASTE REDUCTION AND PREVENTED
        infrastructure have been established in the subcontractor and   periodic controls are provided for biological treatment, in case of any   THE USE OF 30.000 PLASTIC BOTTLES PER YEAR.
        supplier camp sites located in Manisa and Balıkesir provincial borders.   malfunction, it is planned to draw waste water with the sewage truck
        Monthly sewer withdrawals are made by the relevant institutions and   and move it to the treatment plant in the region. The wastewater that
        monthly shoot receipts are regularly obtained from our   goes  through  biological treatment  is  discharged  to  Boukhroufa   We became a member of Materials Marketplace Platform which is a
        subcontractors. All these requirements and practices are defined in   Stream. Since water is treated before discharging, there is no negative   Business World and Sustainable Development Association (SDA
        the “Water Management Procedure” and our procedure has been   impact on waste water. Since subcontractor personnel are staying in   Turkey) project, in order to demonstrate the importance we attach to
        notified to all our subcontractors.                    the camp site owned by Nurol Construction, a common practice is   the circular economy The Materials Marketplace Platform, supported
        Balıkesir Motorway Project water discharges; Uzumcu River is   made regarding the disposal of wastewater. Periodic wastewater   by EBRD, is a cyclical economy project designed to support inter-com-
        approximately 56 km long and combines with Simav River, which is   analysis complies with discharge limits.            pany/industry reuse of materials (waste, by-product, etc.). As Nurol
        born from Ivrindi district of Balikesir city and flows into Marmara Sea.   In our Souk Tleta Dam Project, domestic wastewater is discharged to   Construction, the remaining materials of the Balıkesir Motorway
        It is seen that the flow from our project does not harm the biological   the sewage system located in the sub-region of the site, using local   Project demobilization process were shared with the buyers through
        diversity of Üzümcü Stream. Yearly average of 10.950 m  of treated   septic tanks. This sewage system reaches the treatment plant in the   the project. In this way, we recycled waste materials back into use and
                                                  3
        water is discharged. Waste-water assessment frequency is in line   Oued Smar region. It is known that the water coming out of the   contributed to the circular economy.
        with legislation, the analysis show that we meet discharge standards.  system is released to the bed of Bougdura stream and reaches to the   In the Balıkesir Motorway Project, within the scope of waste   Within the scope of our Balıkesir Motorway Project, with regards to
        In our Konya Eyiste Viaduct Project, wastewater is collected in the   Mediterranean Sea. In case of any blockage in the waste water   management works, a campaign related to waste batteries was   hazardous waste, 3,6 tons of packaging waste, 1,2 tons of oil, fuel
        septic tank due to the non-availability of a sewage system. There is no   systems of our Souk Tleta Dam Project, sewage service is provided.   organized, as well as the batteries used in the project, the battery   filter, other hydraulic oils and vegetable waste oil and 0,16 tons of
                                                                                                                               wastes  resulting from their personal  use were included in  the   electronic waste have been generated. In the non-hazardous class,
        WASTE MANAGEMENT                                                                                                       campaign. We launched the “Bring Back the Old Battery, Take the   approximately 4 tons of packaging waste  were exposed. While
                                                                                                                                                                                      packaging wastes, other hydraulic oil, vegetable waste oil and
                                                                                                                               New” campaign and ensured that the working sta  took new
        In addition to the legal requirements we are subject to, we ensure that   try to reduce waste generation in cases where we cannot do this.   batteries from the warehouse provided that they brought the empty   electronic wastes are all recycled, packaging waste, oil and fuel filters
        our wastes are collected separately in our headquarter and in all our   Minimizing the amount of waste generated, re-use for other   battery. This increased the amount of waste battery collection, and   have been sent to licensed disposal facilities. The total amount of
        projects, and that they are recycled or disposed according to the type   purposes, recycling and treatment options and finally waste disposal.   there was a decrease in unnecessary battery consumption. The   hazardous waste transported is 5 tons.
        of waste. Our main principle is to plan activities with a preventive   For this reason, we create waste management plans, identify our   campaign  enabled  us  to  regulate  our  current  battery  waste   Compared to our 2018, both hazardous waste and non-hazardous
        approach to waste generation and to make decisions regarding this.   waste resources, monitor and report the amounts of our waste on a   management. The amount of waste batteries collected in 2019 is   waste amounts decreased. In addition to the conscious act of
        The  primary  purpose  is  to  avoid  waste  generation  in  the  waste   monthly basis. In our activities where wastes are excessively   worth 2,3 kg.                       employees and management on waste reduction, the completion of
        management process. According to the waste hierarchy, our first goal   developed, we are developing plans to reduce waste. We ensure that   We share detailed tables in our performance evaluation section,   our project in 2019 while decreasing is a major factor. In our project,
        in our waste management is to eliminate waste at its source and to   waste is collected separately at each construction site where recycling   consisting of quantities disposed and recycled according to the types   the rate of recycling our waste is extremely high.
                                                                                                                               and quantities of solid waste that appeared in our projects in the year
                                                                                                                               2019.