           CORPORATE PROFILE



           IMPROVING OUR CORPORATE STRUCTURE, INCREASING OUR TURNOVER AND PROFITABILITY    About Nurol Construction
           YEAR OVER YEAR WHILE CLAIMING THE UNIVERSAL SUSTAINABILITY PRINCIPLES AND ETHICAL   The company is a member of Nurol Group Companies. The main shareholder is ‘Nurol
           VALUES AND  INTERNALISE THEM WITH ALL OUR EMPLOYEES IS OUR REAL GOAL            Holding A.Ş.’, and it is controlled by ‘Carmıklı’ family members. It was established in 1966
                                                                                           in Ankara and moved its HQ to Istanbul in 2015. It contributed to agriculture and heavy
                                                                                           industry with irrigation and turnkey industrial plant projects during the establishment
                                                                                           period.  Utilizing effective  and innovative  technology in  all  projects,  in  1976,  Nurol
           Detailed Info                                                                   Construction became a pioneer in the sector with Ayas Tunnel project by implementing
           Ongoing Projects of Nurol Construction: https://www.nurolinsaat.com.tr/en/ongoing-projects  New Austrian Tunneling Method technology in Turkey for the first time.
           Completed Projects of Nurol Construction: https://www.nurolinsaat.com.tr/en/completed-projects
                                                                                           Nurol Construction, which has proud references because of its great contributions
                                                                                           to the construction and contracting sector in the global sense, has successfully
                                                                                           completed infrastructure projects like motorways, bridges, viaducts, tunnels, and
                                                                                           dams as well as superstructure projects like industrial facilities, hotels, shopping
                                                                                           malls, and residentials thanks to its white-shoe firm culture and experienced staff.

                                                                                           Dedicated to always applying proper architectural and engineering solutions in
                                                                                           line with contemporary necessities and all projects, Nurol Construction completed
                                                                                           satellite town and luxury estate projects which have been globally and locally
                                                                                           appreciated in terms of design and quality.

                                                                                           The Ilısu Dam and Hydro-Electric Power Plant project is Turkey’s second largest dam with
                                                                                           an 11 billion m3 reservoir, 1.200 MW installed capacity, and annual 4.1 billion kWh energy
                                                                                           production capacity. The dam contributed to the reduction of Turkey’s energy deficit.

                                                                                           The Bosphorus Tube Tunnel Crossing Project (MARMARAY) connected two sides of
                                                                                           İstanbul by utilizing cutting-edge technology with a railway line 60 meters under sea level.

                                                                                           As the largest Build-Operate-Transfer Project in the history of the Republic of Turkey
                                                                                           with a total value of $7.5 billion, the Gebze-Orhangazi-Izmir Motorway reduced
                                                                                           travelling time between Istanbul and Izmir from 9 to 3.5 hours. The Osmangazi
                                                                                           Bridge, as the most important part of the Project, is the second longest bridge in
                                                                                           Europe and the fourth longest bridge in the world with its 1,550 m central span and
                                                                                           total length of 2,907 m total length including its connection decks. The 1,372 m-long
                                                                                           Southern Approach Viaduct that connects the southern piers of the Osmangazi
                                                                                           Bridge to the motorway contains a total of 33,000 tons of steel and set a world
                                                                                           record in the quantity as the first 22,500-ton steel structure to be completed
                                                                                           through the incremental launching method at a length of 1,123 m, while a Turkish
                                                                                           record was set when the last deck weighing 2,600 tons was hoisted into position.
                                                                                                                                                                    7