           OPERATIONAL MAPPING



           As of the end of 2022, our activities by countries are listed below.







           TURKEY                                                                          ALGERIA
           Provisional acceptance for the Gebze - Orhangazi - İzmir Motorway Project and Balıkesir - Kırkağaç -   The ongoing projects under Nurol Construction Algeria, which was established in 2003, are as follows by
           Akhisar Section Projects was realized in 2019 and the works within the warranty period was completed in   the end of 2022:
           2020.
           The provisional acceptance of the construction works of the Ilısu Dam and Hydroelectric Power Plant   Souk Tleta Dam Project
           Project was made in 2020, the provisional acceptance of the construction works of the Hasankeyf Group
           Bridges Project was realized in 2021, and the provisional acceptance of the Yusufeli Dam Bridges and   Boukhroufa Dam Project
           Eğiste Hadimi Viaduct was realized in 2022. Our ongoing projects in 2022 in our country, where we have   Tizi Ouzou Connection Highway Project
           been operating since 1966, are as follows:
                                                                                           GEORGIA
           Ordu Ring Road Supplementary Works Project                                      Nurol Georgia was established in Batumi, Georgia in April 2007 to operate in the construction sector. Nurol
           Eğiste Hadimi Viaduct Project                                                   Georgia has completed the construction of the Ministry of Internal Affairs building in Tbilisi, Sheraton Hotel
           Yusufeli Dam Bridges Supply Project                                             in Batumi, and headquarters of Nurol Georgia. The construction of Batum Sheraton Hotel was completed
                                                                                           in 2010 and Nurol Georgia currently manages its operations as well. Nurol Construction Georgia completed
           Silifke-Mut Road Project                                                        Paravani Hydroelectric Power Plant Regulator, Valve Room, Central Building Construction and  Procurement
           Ümraniye-Ataşehir Göztepe Metro Project,                                        of Hydromechanics Equipment Project in 2015.
           Yeşilyaka Project
           İzmir Çiğli Tram Line Construction Works Project                                UNITED ARAB EMIRATES
           TUSAS B1070 Test Building Construction Works Project                            Nurol U.A.E. was established as a local company in April 2003 in Abu Dhabi, the capital city of the United
                                                                                           Arab Emirates as a local company. Dubai branch was opened in 2004. The main purpose of the company
                                                                                           is to evaluate the potential in the construction sector in the region and operate in voluminous projects.
                                                                                           P20 The Cove Dubai, P32 Dubai Creek Building and Beach Vista projects were provisionally accepted in
           ROMANIA                                                                         2022, bringing the total number of projects completed in the Emirates to 29. In 2022, the projects were
           Efforts to establish the Nurol Construction Romania office started in 2017 and were completed in early   successfully completed. As of 2022 year-end, our ongoing projects are as follows:
           2018. Business development activities, especially for infrastructure projects, brought results with the
           Nusfalau - Suplacu de Barcau Highway Project, the contract of which was signed in 2020. Our ongoing   Riyadh City Phase-4, Infrastructure Works Project (Abu Dhabi)
           projects as of the end of  2022 are as follows:

           Nusfalau – Suplacu de Barcau 3B5 (km 66 + 500 – km 80 + 054.044) Motorway
           Design and Construction