İstanbul Metro Project -


                  Phase 1 Section 1

                  (Şişli – 4.Levent),


                  İstanbul/TURKEY:







                    The İstanbul Metro Project

                       Phase 1 was executed by
                        Metro-1 Joint Venture in
                         which NUROL has 30%

                    share. There are 3 stations
                  on the route. It is one of the

                           earliest metro lines in
                                            İstanbul.


















                                                                                          The excavation depth varies between 20-30 m and the total tunnel length (formed of
                                                                                                        double tunnels) is 8.250 m (concreted inner diameter of tunnels: 5,40 m)