Bolaman-Perşembe

                                                                                                    Dual Highway,


                                                                                                    Ordu/TURKEY














                                                                                                The project constructed
                                                                                                by a JV under NUROL’s

                                                                                                leadership was financed
                                                                                                by foreign loans arranged
                                                                                                by the Contractors. Total

                                                                                                length of the highway is
                                                                                                27 km. It was completed

                                                                                                in 2009.


                Within the project scope, 42 bridges (24 single span,
           3 double span, 10 three span, 3 four span and 2 five span
             bridges) were constructed. 5 double tunnels are located
                 along the highway route (5x2) with a total length of
        4.600x2 m. Moreover, the longest highway tunnel in Turkey
           was constructed in the route with a length of 2 x 3,8 km.