PROJECTS: ON-GOING AND
OUT OF THE SCOPE OF REPORT
GEBZE – ORHANGAZİ – İZMİR MOTORWAY PROJECT ORDU RING MOTORWAY PROJECT
The Ordu Ring Motorway is being constructed by NUROL-YÜKSEL-ÖZKA-YDA Joint Venture. The project consists of 21,4 km of 2x2 lanes split
As per the implementation centers, 3 tunnel operation and motorway with miscellaneous motorway structures of 5.3 km*2 length (3.3 km*2+2km*2) double tube, 3 viaducts total of 1.98 km length, 5
contract signed on 27 maintenance centers and 18 bridges, 2 underpass and 3 crossover road along the route. The project completed in 2018.
September 2010 between bilateral motorway service
General Directorate of facilities (A type: 2, B Type: 4, C
Motorways and Motorway type: 5 and D Type: 7). Dilovası ORDU MOTORWAY CONNECTION PROJECT
Investment and Operating Co., Intersection (km:0+000) and The project owner is Nurol-Yüksel-Özka-YDA Joint Venture and signed an additional agreement aiming to complete the remaining construction
that became e ective on 15 İznik South Intersection activities. According to the agreement, project is expected to be completed by 2022.
March 2013 a total of 427 km (km:58+152) are completed and
motorway -384 km motorway & opened to tra c, for the rest of
43 km connection way- is being the project construction SİLİFKE-MUT ROAD PROJECT
constructed between Gebze and continues. As per the Under Nurol Construction's responsibility; Silifke-Mut Road will be completed for 16.7 km highway, having 2X2 road section together with tunnel
izmir. The scope of the project implementation contract, and engineering structures. 6.850 meters length of double tube and 410 meters II. Kılıçarslan Bridge (cable-stayed and balanced cantilever
includes İzmit Bay Bridge, 29 construction period is 7 years beam method) are also under the scope of the project.
viaducts, 3 tunnels, 199 after the contract became valid
motorway bridges, 20 toll and accordingly o cial project
booths area, 25 Intersection, 6 completion date is March 2020. ILISU DAM AND HEPP PROJECT AND HASANKEYF
operation and maintenance GROUP BRIDGES PROJECT
Nurol- Cengiz Joint Venture Nurol-Cengiz Joint Venture also
PTO TİZİ OUZOU BOUİRA INTERSECTION MOTORWAY established for the construction established Nurol Cengiz
PTO PROJECT of Ilısu Dam and HEPP, located Hasankeyf Partnership for the
on Tigris River in Mardin, dam completion of Hasankeyf Group
The Tizi Ouzou-Bouira intersection with 48 km length is being
constructed by Özgün-Nurol Joint Venture in Algeria. will be constructed by concrete Bridges Project considering the
In 2018, for the project: face rockfill and the dam body agreement dated 2013. Project
volume will be 23,76 million m , includes construction of
3
by 1.200 MWh capacity with Hasankeyf-1, Hasankeyf-2,
1.400.000 m cut excavation
3
470.000 m fill 4.120 GWh yearly production. Reşat Baysal and Başur
3
75.000 m reinforced concrete production Dam foundation is 131 meters Motorway Bridges in Batman
3
346.000 m tunnel excavation high and maximum water level and Siirt cities. Project
3
3
3.800 m tunnel pavement concrete production of 528.87 meters. Project completion date is September
185.000 tons of superstructure wet mix production completion date is June 2019. 2019.
231.000 tons of superstructure hot mix production completed.
Expected project completion: 2023. UNITED ARAB EMIRATES PROJECTS
YUSUFELİ DAM RESERVOIR VIADUCTS PROJECT NUROL UAE, started business as a local firm in Abu Dhabi- the capital city of UAE- in April 2003. In 2004, Dubai branch opened. Founding
purpose is to materialize high scope projects via benefiting from the current potential in construction industry.
4 Viaducts, to be implemented by balanced
3
3
cantilever beam method in Yusufeli District of Artvin 277.539 m cut excavation 457.777 m foundation excavation Ongoing projects of Nurol UAE in Dubai and Abu Dhabi by end of 2018 are as below:
3
City has assigned to Nurol-Gülsan Joint Venture by 33.873 m bolt production 452 m plain concrete production,
General Directorate of Motorways. The project began 13.191 m barbican production 718 tons of reinforcement working
3
in 2017 and expected to be completed by 2021. 253 tons of matting steel production 3.562 m reinforced concrete production The Cove Dubai Gulf Building Project Cordonnier Estate Building Project
In 2018, for the project: 22.408 tons of shotcrete production completed. Located in Dubai, total construction area is 76.000 sqm and there will Located in Abu Dhabi, with total construction area of 67.000 sqm,
be 3 residence buildings. construction of tower including commercial, o ce and residence
GA09 Golf Apartment Building Project sections will be completed.
YEŞİLYAKA PROJECT GA14 Golf Link Villas Project
Located in Dubai, 288 (108X1, 132X2, 32X3, 2X4 Bedroom and 14
Yeşilyaka project contains the construction villas, social facility, sales o ce and trading area, around Büyükçekmece Sırtköy district on detached house) apartment (Z+11) construction will be completed. Located in GA14 region in South Emaar, construction of 204 villas will
2
1.000.000 m land. For the Yeşilyaka Project Mesa- Nurol Joint Venture established. P32 Parcel Dubai Gulf Building be completed by 2020.
Dubai Vista Beach Residential Towers Project
ÜMRANİYE ATAŞEHİR GÖZTEPE METRO PROJECT Located in Dubai, construction of twin towers including 471 residen-
ces will be completed Located in Dubai Harbor, residential towers (2) will be completed by
The project consists of the construction of a 13 km long double tube TBM tunnel along with 2 train storage tunnels and a connection tunnel. 2021.
There are 11 stations within the scope of the project, 5 of which being shaft+tunnel type. Construction scope is architectural and
electromechanical installment. For this project, Gülermak-Nurol-Makyol Joint Venture established.
20 NUROL YES SUSTAINABILITY REPORT 2018 ON GOING PROJECTS 21