SOCIAL IMPACTS AND ACTIONS IN SUPPLY CHAIN
2018 findings related with social impact scanning of our new suppliers on project basis is as below:
Balıkesir Motorway Project
We did not encounter any uninsured personnel in the subcontractors Manager. The aim of this process is to work with subcontractors with
operating within the scope of our project. The health examinations higher OHS-E performance and create OHS-E awareness on
and orientation trainings of the personnel who will be employed for sub-contractors during the tender stage. In addition, a
Nurol Construction are conducted one day prior to employment. sub-contractor evaluation plan was prepared for our project.
Subsequently; ‘Personal Protective Equipment’ is embezzled and Subcontractor performances are evaluated through interim or
employees started to work the subsequent day. end-of-job evaluations in line with this plan. Within the scope of the
Our project is classified as 'High-Risk Job Class' and it is forbidden to evaluation questions, scoring is also made according to employee
employ forced labor and child labor in accordance with the provisions rights of the personnel employed by the sub-contractor (SSI
of Article 4 of Labor Law No. 4857 and the provisions of Occupational registration and premium payment, wages, compensation payments,
Health and Safety Law No. 6331. etc.) on a regular basis.
When subcontractor elections are held, “Subcontractor Selection Within the scope of "second-party audit", our internal auditor teams
Process OHS-E Evaluation Form” is used within the scope of OHS-E audit subcontractor and main suppliers. During the audits, quality
assessment. The completed version of the Evaluation Form is shared and OHS-E issues and legal compliance are also audited. The results
with OHS-E Manager. The evaluation report is prepared by OHS-E of these audits and following 'Corrective Action' process tracked
which a ect the performance of subcontractor and supplier.
Konya Eyiste Viaduct Project
The legal regulations in force are applied and the documents documents are subject to physical checks during the work period and
requested by the suppliers and subcontractors for the personnel by the end of 2018, no misfit occurred.
before starting the work are provided and checked. Personnel
Boukhroufa Dam Project
Absolutely no concessions in terms of uninsured employment, forced reviewed on a monthly basis for the review of uninsured
labor and child labor during and after subcontractor elections. In employment. It is strictly forbidden to employ uninsured or child
Algeria, as in our country, although there is no obligation to obtain a labor. In our project, until the end of 2018, no negative cases related
sub-contractor insurance number attached to the employer insurance to these issues were encountered.
number and not to employ uninsured workers; subcontractors are
Souk Tleta Dam Project
For the subcontractors who employ one-to-one workers in our and forced labor within the framework of the following principles. In
construction site, we control issues like child labor, uninsured labor our project, there was no negative incident in 2018. SUBCONTRACTORS AND SUPPLIERS ACCORDING TO PROJECTS
Main subcontractors of our Balıkesir Motorway Project are groundworks,
superstructures, large art structures and secondary works companies. Suppliers are
large art structures, other materials and transport, small art structures companies
Full list of employees and operating in the related field.
SSI Rolls of employees Main subcontractors of our Konya Eyiste Viaduct project are viaduct reinforced
Copy of the employee contracts concrete and ground works companies. Suppliers are viaduct reinforced concrete,
bored piles and shoring works companies.
Main subcontractors of our Boukhroufa Dam Project are the companies that make
rough construction and injection works. Suppliers are viaduct reinforced concrete,
bored piles and shoring works companies. Companies providing purses, iron, steel,
explosive materials, sand, gravel, stone chips.
Main subcontractors of our Souk Tleta Dam Project are ground works, electrical
displacement works, various manufacturing and drilling works companies.
Suppliers are other operating materials and timber companies.