SOCIAL IMPACTS AND ACTIONS IN SUPPLY CHAIN
          2018 findings related with social impact scanning of our new suppliers on project basis is as below:
          Balıkesir Motorway Project
          We did not encounter any uninsured personnel in the subcontractors   Manager. The aim of this process is to work with subcontractors with
          operating within the scope of our project. The health examinations   higher OHS-E performance and create OHS-E awareness on
          and orientation trainings of the personnel who will be employed for   sub-contractors during the tender stage. In addition, a
          Nurol Construction are conducted one day prior to employment.   sub-contractor evaluation plan was prepared for our project.
          Subsequently; ‘Personal Protective Equipment’ is embezzled and   Subcontractor performances are evaluated through interim or
          employees started to work the subsequent day.         end-of-job evaluations in line with this plan. Within the scope of the
          Our project is classified as 'High-Risk Job Class' and it is forbidden to   evaluation questions, scoring is also made according to employee
          employ forced labor and child labor in accordance with the provisions   rights of the personnel employed by the sub-contractor (SSI
          of Article 4 of Labor Law No. 4857 and the provisions of Occupational   registration and premium payment, wages, compensation payments,
          Health and Safety Law No. 6331.                       etc.) on a regular basis.
          When subcontractor elections are held, “Subcontractor Selection   Within the scope of "second-party audit", our internal auditor teams
          Process OHS-E Evaluation Form” is used within the scope of OHS-E   audit subcontractor and main suppliers. During the audits, quality
          assessment. The completed version of the Evaluation Form is shared   and OHS-E issues and legal compliance are also audited. The results
          with OHS-E Manager. The evaluation report is prepared by OHS-E   of these audits and following 'Corrective Action' process tracked
                                                                which a ect the performance of subcontractor and supplier.


         Konya Eyiste Viaduct Project
         The legal regulations in force are applied and the documents   documents are subject to physical checks during the work period and
         requested by the suppliers and subcontractors for the personnel   by the end of 2018, no misfit occurred.
         before starting the work are provided and checked. Personnel
          Boukhroufa Dam Project
          Absolutely no concessions in terms of uninsured employment, forced   reviewed on a monthly basis for the review of uninsured
          labor and child labor during and after subcontractor elections. In   employment. It is strictly forbidden to employ uninsured or child
          Algeria, as in our country, although there is no obligation to obtain a   labor. In our project, until the end of 2018, no negative cases related
          sub-contractor insurance number attached to the employer insurance   to these issues were encountered.
          number and not to employ uninsured workers; subcontractors are
          Souk Tleta Dam Project
          For the subcontractors who employ one-to-one workers in our   and forced labor within the framework of the following principles. In
          construction site, we control issues like child labor, uninsured labor   our project, there was no negative incident in 2018.                SUBCONTRACTORS AND SUPPLIERS ACCORDING TO PROJECTS

                                                                                                                                                           Main subcontractors of our Balıkesir Motorway Project are groundworks,
                                                                                                                                                       superstructures, large art structures and secondary works companies. Suppliers are
                                                                                                                                                       large art structures, other materials and transport, small art structures companies
                                                Full list of employees and                                                                                                 operating in the related field.
                                                SSI Rolls of employees                                                                                   Main subcontractors of our Konya Eyiste Viaduct project are viaduct reinforced
                                                Copy of the employee contracts                                                                          concrete and ground works companies. Suppliers are viaduct reinforced concrete,
                                                                                                                                                                      bored piles and shoring works companies.
                                                                                                                                                        Main subcontractors of our Boukhroufa Dam Project are the companies that make
                                                                                                                                                        rough construction and injection works. Suppliers are viaduct reinforced concrete,
                                                                                                                                                       bored piles and shoring works companies. Companies providing purses, iron, steel,
                                                                                                                                                                     explosive materials, sand, gravel, stone chips.
                                                                                                                                                         Main subcontractors of our Souk Tleta Dam Project are ground works, electrical
                                                                                                                                                          displacement works, various manufacturing and drilling works companies.
                                                                                                                                                               Suppliers are other operating materials and timber companies.