Page 16 - Nurol YES Sustainability Report
P. 16
OPERATIONAL MAPPING
Romania
E orts to establish Nurol Construction Romania o ce started in 2017 and were completed in early 2018. Business development activities,
especially for infrastructure projects, continued throughout 2019.
Morocco
Nurol Construction Morocco o ce, established at the beginning of 2012 for the construction of El Jadida Safi Motorway Lot 3&4 Project.
Business development e orts are continued in the region after the final acceptance of the project in 2017.
Algeria
Romania
The ongoing projects under Nurol Construction Algeria, which was established in 2003, are as follows by the end of 2019:
Georgia
Souk Tleta Dam Project,
Turkey Boukhroufa Dam Project,
Tizi Ouzou Motorway Project.
Iraq Turkey
Morocco
Algeria Our ongoing projects as of the end of 2019 in our country where we have been operating since 1966;
Libya United Arab
Emirates Gebze - Orhangazi - İzmir Motorway Project, Eyiste Viaduct Project,
Yusufeli Dam Bridges Project,
Balıkesir - Kırkağaç - Akhisar Section Project,
Saudi Ilısu Dam and Hydroelectric Power Plant Project, Silifke-Mut Road Project,
Arabia Hasankeyf Group Bridges Project, Ümraniye-Ataşehir Göztepe Metro Project,
Ordu Ring Road Supplementary Works Project, Yeşilyaka Project.
Georgia
Nurol Georgia was established in Batumi, Georgia in April 2007 to operate in the construction sector. Nurol Georgia has completed the
construction of the Ministry of Internal A airs building in Tbilisi, Sheraton Hotel in Batumi and headquarters of Nurol Georgia. The
construction of Batum Sheraton Hotel was completed in 2010 and Nurol Georgia currently manages its operations as well. Nurol
Construction Georgia completed Paravani Hydroelectric Power Plant Regulator, Valve Room, Central Building Construction and Procurement
of Hydromechanics Equipment Project in 2015.
Saudi Arabia
Nurol Construction Saudi Arabia was established in 2010 and took license for infrastructure systems, building and premises, clean water
and waste-water systems construction, electric and electro-mechanics projects and road building.
COUNTRY OFFICES United Arab Emirates
Nurol U.A.E. was established on April 2003 in Abu Dhabi, the capital city of the United Arab Emirates as a local company. Dubai branch
Headquarters Turkey Romania Georgia - Batumi was opened in 2004. The main purpose of the company is to evaluate the potential in the construction sector in the region and operate
Nurol Plaza, Büyükdere Caddesi Nerva Traian Street No.9, Block Luka Asatiani 1 Batumi in voluminous projects.
No: 255 İç Kapı No: 1902 Maslak-Sarıyer M67, Door no. 2, Floor 2, Apartment GEORGIA
34485 ISTANBUL No:40, District 3, Bucharest / ROMANIA Phone : (+995) 222 760 58 Corniche Tower Building Project (Abu Dhabi) P32 Parcel Dubai Gulf Building Project (Dubai)
Phone : (0 212) 286 80 10 Phone : (+40) (21) 371 11 74 Fax : (+995) 222 763 32 P20 The Cove Dubai Gulf Building Project (Dubai) GA14 Golf View Villas Project (Dubai)
Fax : (0 212) 286 80 11 Fax : (+40) (21) 371 11 74 GA09 Golf View Apartment Building Project (Dubai) Beach Vista Towers Project (Dubai)
Iraq
Algeria United Arab Emirates Saudi Arabia
Allee De Palmiers (Impasse) 15 NUROL LLC., P.O. Box 46254 6468 Al Rossais Commercial Center The Branch located in the Iraqi city of Sulaymaniyah in the region of Piramagrun has a silo complex with a capacity of 80.000 tons and
Lotissement Cıte Djenane El Malık-Hydra Abu Dhabi / UAE Al Ulaya Street – Al Ulaya District 12 warehouse buildings. Final acceptance is made in the project.
Alger / ALGERIA Phone : (+9712) 666 6810-4540 Riyadh 12211-3857
Tel/Fax : (+213) 021 605 237 Fax : (+9712) 666 3510 Kingdom of Saudi Arabia
Phone : (+9661) 269 4555
Fax : (+9661) 269 3555
16 NUROL YES SUSTAINABILITY REPORT 2019 CORPORATE PROFILE 17