determined through the QDMS system are approved after the control   In order to disseminate the acquired experiences of work accidents   Detailed information and explanations about our OHS performance are included in the “Performance Evaluation” section of our report.The total
        of the Integrated Management Systems Department.       within the company, work accidents with more than 10 days of loss in   number of accidents, the number of accidents with lost days, occupational injury and serious injury rates are given below.
        All our employees have an obligation to report an accident. Our   our project are forwarded to the incident review e-mail group in which   Our accidents requiring first aid are not included in our lost day accident numbers. Accidents with one or more lost days are included in the
        subcontractors are obliged to inform us of an accident instantly,   all the reports include general manager, deputy general manager,   "number of lost day accidents". While calculating the serious injury rate caused by work in 2018, we made our calculations by including the number
        create the incident report, collect necessary documents for the   group managers, project managers and OHS-E teams. In this e-mail   of fatal accidents on the day of loss. Since GRI 403: Occupational Health and Safety 2018 standard does not include fatal accident numbers in the
        accident notification and convey it to us, report to SSI in case of   group, along with the major accident results, the project is informed   formulas in section 2.1.4 of section 403-9, the calculations for 2019 were made accordingly.
        accidents in lost time within the o cial time, perform the actions   by the OHS-E Manager about the works to be done to eliminate the
        determined after the accident in full and notify us. It is among the   main  causes  in  preventing  the  recurrence  of  accidents.The
        responsibilities of the subcontractor to ensure that all OHS measures   information about the actions to be taken and the accident   TOTAL ACCIDENT NUMBER, FREQUENCY AND WEIGHT RATIO - 2019
        are taken during the works and to inform the employees in this regard   investigation team's information published via this group.
        in order to prevent accidents again.                                                                                                                Number of    Number of Accidents   Occupational  Occupational Serious  Total
                                                                                                                                                             Accidents     with Lost Days   Injury Rate     Injury Rate    Working Hours
        Some operational measures we have implemented for risky activities in our projects are as follows;                     Balıkesir Motorway Project      22               4              8,43            1,53         2.609.208

                                                                                                                               Konya Eyiste Viaduct Project     4               0              15,14            0            264.276
                                                                                                                               Boukhroufa Dam Project          15               12             17,97          14,37          834.827
              Recruitment medical examinations of all our project employees       Construction machines are used only by authorized/certified
            and subcontractors are made, and their medical examinations   operators.                                           Souk Tleta Dam Project          12               9             16,68            12,51         719.376
            are renewed annually.                                                                                              Not : Calculations were made using the formulas below.
                                                                  Blasting work permit systematic is applied for blasting      Work Related Serious Injury Rate = Total Number of Accidents/Total Working Hours x 10 6
              Anti-fall systems and appropriate personal protective   operations.                                              Work-related Injury Rate (Except for fatal accident) = Number of lost-day accidents (Except for fatal accident) Total Working hoursx10 6
            equipment are used in high works. In our Konya Eyiste Viaduct
            Project, the precautions to be taken for climbing mold and       Power tools and cables are checked and periodically controlled
            formwork trolley systems to be used in balanced console   by the responsible electrician before starting work. Earthing   When we review our 2019 accident data, a general decrease in our accident numbers compared to 2018 can be seen. Our total work injury rate has
            manufacturing for working at height, are planned by discussing   measurements of electrical equipment are carried out once a   decreased in 2019 due to the decrease in our total working hours. In our Balıkesir Motorway Project, 22 cases occurred in 2019, 19 of which belong
            with the manufacturer company and special solutions are   year.                                                    to our subcontractors. 11 of these accidents were material damaged accidents. 6 of them resulted in an accident requiring first aid. The remaining
            provided when necessary. Facade lifts are used to access high                                                      4 accidents were recorded as lost time.No lost day accident has occurred in our Konya Eyiste Viaduct Project, and all 4 accidents that occurred
            work areas.                                           Color coding is applied for electrical equipment and electrical   there did require first aid. 12 of the 15 accidents in our Boukhroufa Dam Project were lost-day accidents and 2 of the lost-day accidents belonged
                                                                 controls are performed in accordance with the color code      to our subcontractor personnel. Compared to the previous year, a significant decrease is observed in our occupational injury rates. In our Souk
              Functionality of the sca olding and platforms used are   procedure.                                              Tleta Project, where 9 accidents with lost days occurred, the decrease in working hours in 2019 is e ective in the increase in the frequency of the
            checked with lists before and after use.                                                                           accident compared to last year.
                                                                  Appropriate storage conditions are provided for chemical
              Red and green labeling are applied for sca olding and   materials used in project activities, material safety data sheets
            platforms, red labels are placed on improper sca olding   were provided and hung in the storage areas.                                                OCCUPATIONAL INJURY RATE
            platforms and their use is prevented.                                                                                40
                                                                  In our projects, noise, vibration, dust emission and lighting
              Tra c Management Plans are being prepared for tra c   measurements are made once a year and actions are taken for                                                                                             2018  2019
            management applications at the project site.         inappropriate values.                                           30

              Periodic audits are made for all lifting equipment and pressure       It is ensured that the work sites are organized.
            vessels used in the project, vehicles without inspection are                                                         20
            removed from the field.                                All personnel are provided to use personal protective
                                                                 equipment specific to the work.                                  10
              Before the lifting operations, the lifting plan is prepared and
            the relevant personnel, duties and responsibilities are       There are fixed, permanent or temporary warning signs
            transferred.                                         according to the risks in the work site.                         0
                                                                                                                                       Balıkesir Motorway Project  Eyiste Viaduct Project  Boukhroufa Dam Project  Souk Tleta Dam Project
              Daily controls of the construction machines are carried out by
            the operators and are recorded with the control form, daily                                                        We value OHS for our supply chain too, and we included our practices in the “Value Chain Management” section.
            breakdown maintenance is recorded.