Page 69 - 2022 NUROL YES SUSTAINABILITY REPORT
P. 69

OCCUPATIONAL          WORKING     OUR    PERFORMANCE          APPLICABLE
                                               CORPORATE   FINANCIAL         SUSTAINABILITY   ENVIRONMENTAL   VALUE CHAIN                           UNGC CONTENT
                                                PROFILE   OUTLOOK  GOVERNANCE  APPROACH  AWARENESS  HEALTH AND   MANAGEMENT  LIFE IN NUROL   CONTRIBUTION TO   INDICATORS   INDEX  GRI SECTOR
                                                                                                   SAFETY             CONSTRUCTION  SOCIETY  DETAILS            STANDARD
           OUR CONTRIBUTION TO SOCIETY



           l The fuel for our company vehicles and machinery, as well as the maintenance   BOUKHROUFA DAM PROJECT
           and repairs for these vehicles, is sourced from local fuel stations and auto repair  Our project, which is located in the city of El Tarf in the northeastern of Algeria,
           shops at our project locations.                                                 is expected to  contribute to the country both locally and  nationally. This region
           l Maintenance, general supplies, and items required for our project, such as    is considered an important investment in terms of the development of the area,
           water, food, and cleaning products for our construction site, are provided by local  as it is less developed compared to other regions. It is anticipated that the dam
           businesses and suppliers.                                                       constructed within the scope of our project will prevent floods caused by heavy
           l During the excavation work along the tramline, mobile pedestrian crossing     winter rains in the region. Additionally, the dam will provide a water source for the
           platforms were prepared to ensure safe and convenient pedestrian crossings,     operation of phosphate mines in the region and contribute to the Algerian economy.
           serving the needs of pedestrians.
           l Within the scope of environmental improvements, sidewalks along the tramline   Our Project Management Office maintains continuous communication with
           were enhanced, and the lighting installations associated with our construction  nearby villages and districts, allowing us to individually address the complaints
           activities resulted in improved street lighting throughout the route. This positively   and requests of all local residents and employees. These complaints and requests
           affected local businesses such as cafes, restaurants, markets, pharmacies, and  are promptly evaluated, and necessary measures are taken. Some of the support
           healthcare facilities.                                                          programs implemented within our project are as follows:
           l Damaged or repairable water, natural gas, and electrical lines that were affected
           during excavation work were repaired by our team.                               l Roads have been constructed or rehabilitated in the region as needed, and periodic
           l For personnel who temporarily relocated from different cities for the project and   maintenance has been performed on additional district roads around the project.
           stayed on the construction site, accommodations were provided. These personnel  l Drinking water is regularly supplied to a nearby village without a water source
           are able to fulfill their basic, social, and mandatory needs (cafes, restaurants,  using tankers.
           markets, pharmacies, healthcare facilities, etc.) through local businesses.     l Plaster sand has been provided for the construction of a mosque in the village
           l Due to the periodic increase in workload, health check-ups required for all newly  near the project.
           hired personnel are conducted through an agreement with a local healthcare      l Excavators and filling materials have been supplied for the repair of the
                                                    provider.                              infrastructure of the district where the project is located, and excavators have
                                                    l Discussions were held with           been provided for drainage channel cleaning.
                                                    the local community in the Çiğli       l Support, including excavators, bulldozers, water tankers, trucks, and personnel,
                                                    region, where our project is           has been provided to extinguish and prevent the spread of a forest fire in the
                                                    located. Excess concrete samples       province where the project is located in 2022.
                                                    from the project were provided
                                                    to the local community for use in      SOUK TLETA DAM PROJECT
                                                    environmental improvements,            As part of stakeholder engagement activities, the requests and complaints of the
                                                    gardens, and other areas where         local community are collected verbally, similar to our Boukhroufa Dam Project.
                                                    building materials were needed.        Additionally,  the  demands  of  the  Employer  are  met  through  verbal  and  written
                                                    This allowed our tested concrete       notifications that are transmitted to the Project Management Office. Areas
                                                    waste to be recycled and               damaged due to natural disasters in the region are repaired, contributing to the
                                                    repurposed effectively.                local community through local supplier engagement and employment of personnel.





                                                                                                                                                                   69
   64   65   66   67   68   69   70   71   72   73   74