Page 69 - 2022 NUROL YES SUSTAINABILITY REPORT
P. 69
OCCUPATIONAL WORKING OUR PERFORMANCE APPLICABLE
CORPORATE FINANCIAL SUSTAINABILITY ENVIRONMENTAL VALUE CHAIN UNGC CONTENT
PROFILE OUTLOOK GOVERNANCE APPROACH AWARENESS HEALTH AND MANAGEMENT LIFE IN NUROL CONTRIBUTION TO INDICATORS INDEX GRI SECTOR
SAFETY CONSTRUCTION SOCIETY DETAILS STANDARD
OUR CONTRIBUTION TO SOCIETY
l The fuel for our company vehicles and machinery, as well as the maintenance BOUKHROUFA DAM PROJECT
and repairs for these vehicles, is sourced from local fuel stations and auto repair Our project, which is located in the city of El Tarf in the northeastern of Algeria,
shops at our project locations. is expected to contribute to the country both locally and nationally. This region
l Maintenance, general supplies, and items required for our project, such as is considered an important investment in terms of the development of the area,
water, food, and cleaning products for our construction site, are provided by local as it is less developed compared to other regions. It is anticipated that the dam
businesses and suppliers. constructed within the scope of our project will prevent floods caused by heavy
l During the excavation work along the tramline, mobile pedestrian crossing winter rains in the region. Additionally, the dam will provide a water source for the
platforms were prepared to ensure safe and convenient pedestrian crossings, operation of phosphate mines in the region and contribute to the Algerian economy.
serving the needs of pedestrians.
l Within the scope of environmental improvements, sidewalks along the tramline Our Project Management Office maintains continuous communication with
were enhanced, and the lighting installations associated with our construction nearby villages and districts, allowing us to individually address the complaints
activities resulted in improved street lighting throughout the route. This positively and requests of all local residents and employees. These complaints and requests
affected local businesses such as cafes, restaurants, markets, pharmacies, and are promptly evaluated, and necessary measures are taken. Some of the support
healthcare facilities. programs implemented within our project are as follows:
l Damaged or repairable water, natural gas, and electrical lines that were affected
during excavation work were repaired by our team. l Roads have been constructed or rehabilitated in the region as needed, and periodic
l For personnel who temporarily relocated from different cities for the project and maintenance has been performed on additional district roads around the project.
stayed on the construction site, accommodations were provided. These personnel l Drinking water is regularly supplied to a nearby village without a water source
are able to fulfill their basic, social, and mandatory needs (cafes, restaurants, using tankers.
markets, pharmacies, healthcare facilities, etc.) through local businesses. l Plaster sand has been provided for the construction of a mosque in the village
l Due to the periodic increase in workload, health check-ups required for all newly near the project.
hired personnel are conducted through an agreement with a local healthcare l Excavators and filling materials have been supplied for the repair of the
provider. infrastructure of the district where the project is located, and excavators have
l Discussions were held with been provided for drainage channel cleaning.
the local community in the Çiğli l Support, including excavators, bulldozers, water tankers, trucks, and personnel,
region, where our project is has been provided to extinguish and prevent the spread of a forest fire in the
located. Excess concrete samples province where the project is located in 2022.
from the project were provided
to the local community for use in SOUK TLETA DAM PROJECT
environmental improvements, As part of stakeholder engagement activities, the requests and complaints of the
gardens, and other areas where local community are collected verbally, similar to our Boukhroufa Dam Project.
building materials were needed. Additionally, the demands of the Employer are met through verbal and written
This allowed our tested concrete notifications that are transmitted to the Project Management Office. Areas
waste to be recycled and damaged due to natural disasters in the region are repaired, contributing to the
repurposed effectively. local community through local supplier engagement and employment of personnel.
69