Page 13 - Demo
P. 13
Our report, which includes Nurol Construction%u2019s approach and performance in Ecosystem, Social and Governance (ESG) areas for 2023, includes the following projects; Souk Tleta Dam Project (Algeria), Boukhroufa Dam Project (Algeria), %u00dcmraniye-Ata%u015fehir-G%u00f6ztepe Metro Line Project (Istanbul/Turkey), %u0130zmir %u00c7i%u011fli Tram Line Project (%u0130zmir/Turkey), Nusfalau - Suplacu De Barcau 3B5 Motorway Design and Construction Project (Romania), B1070 Test Building Construction Project (Ankara), B557 Production and R&D Building Construction Project (Ankara/Turkey) and Bal%u0131kesir Dry Pet Food Factory T%u00fcrkiye -1 Project (Bal%u0131kesir/Turkey).In 2023, B1070 Test Building Construction Project (Ankara/Turkey), which started in the last quarter of 2022, Bal%u0131kesir Dry Pet Food Factory T%u00fcrkiye -1 Project (Bal%u0131kesir/Turkey), which started in 2023, and B557 Production and R&D Building Construction Project (Ankara/Turkey) were included in the scope of the report for the first time in 2023. Our joint projects that are not included in the scope of the report but will continue in 2023 are Tizi Ouzou Connection Motorway Project (Algeria), Yusufeli Dam Bridges Supply Works Project (Artvin/Turkey), Ye%u015filyaka Project (Istanbul/Turkey), Ordu Ring Road Supply Works Project (Ordu/Turkey), Silifke-Mut Road Project (Silifke/Turkey). Abu Dhabi-based Nurol LLC., a subsidiary of Nurol Construction, is continuing the Riyadh City Phase-4 Infrastructure Works Project (Abu Dhabi) in 2023. In 2023, please find below a summary of the scope and progress of our ongoing projects: DRY PET FOOD FACTORY TURKIYE-1 PROJECT With the contract signed in April 2023, the Dry Pet Food Factory in Bal%u0131kesir was placed under our contract. Scheduled to be completed in 2025, the scope of the project includes all infrastructure, reinforced concrete, steel and architectural works of the plant with a closed area of approximately 30,000 m%u00b2. In addition, electrical, mechanical works (excluding all kinds of factory process works), automation works, landscaping - landscaping works and coordination of the operation of the factory are also included in the scope. The total project will be completed by the end of 2023:78,789 m3 excavation production9,866 m pile construction31,506 m3 of embankment production18,113 m3 reinforced concrete production3,914 tons of iron production565 prefabricated building elements manufactured and 93 prefabricated elements assembled593 tons of steel construction and 163 tons of steel erection were completed.Bal%u0131kesir Dry Pet Food Factory T%u00fcrkiye-1 ProjectAbout The Report12ONGOING PROJECTS IN 2023Our Sustainability ApproachAbout The ReportUn Global Compact Content IndexApplicable Gri Sector StandardGovernanceSocialPerformance Indicators DetailsEcosystem

