Page 15 - Demo
P. 15
NUSFALAU - SUPLACU DE BARCAU 3B5 (KM 66 + 500 - KM 80 +054.044) MOTORWAY DESIGN AND CONSTRUCTION PROJECTNusfalau - Suplacu De Barcau 3B5 (KM 66 + 500 - KM 80 + 054.044) Motorway Design and Construction Project, which is critical for connecting Romania to Western Europe, was completed and opened to traffic in November 2023. The project is 13.5 km long and designed as a 2x2 motorway. The project includes design, earthworks, art structures, infrastructure transfers, bridge and overpass constructions, sub-base and bituminous base hot mix constructions. Within the scope of the project, 5 bridges and 7 overpasses were constructed with a total length of 620 m.In the project in 2023:744 m3 of cut excavation51,444 m3 of backfill production64 m3 culvert manufacturing82,757 m3 ballast production50,983 m3 stabilized ballast production23,990 tons of bituminous base21,720 tons of binder28,181 tons of abrasion manufacturing were completed.IZMIR CIGLI TRAM LINE PROJECTThe contract for the %u00c7i%u011fli Tram Line Construction Project, which was tendered by %u0130zmir Metropolitan Municipality Rail System Department and for which Nurol Construction submitted the most suitable bid, was signed in December 2020. The tram line with 15 stations with a length of approximately 12 km, a total of 6 transformer buildings, one of which is underground, 700 m long transition viaduct, electromechanical works and the extension of the platform lengths of the Konak Tram Line stops in operation. %u00c7i%u011fli Tram Line Project, which is one of the pioneering steps towards bringing public transportation to modern standards, is planned to be put into operation in 2024.In the project in 2023:40,588 m3 excavation production2,582 m3 embankment production21,539 m3 concrete production6,364 tons of iron labor2 catenary foundations were completed.Total as of project start:125,307 m3 of excavation40,109 m3 of embankment production94,880 m3 concrete production10,219 tons of iron labor676 catenary foundations were completed.About The Report14Izmir Cigli Tram Line ProjectONGOING PROJECTS IN 2023Our Sustainability ApproachAbout The ReportUn Global Compact Content IndexApplicable Gri Sector StandardGovernanceSocialPerformance Indicators DetailsEcosystemNusfalau - Suplacu De Barcau Motorway Design and Construction ProjectTotal as of project start:170,509 m3 of cut excavation1,227,329 m3 embankment production895 m3 culvert manufacturing574,069 m3 ballast production171,984 m3 stabilized ballast production67,925 tons of bituminous base40,414 tons of binder28,181 tons of abrasion manufacturing were completed.

