Page 16 - Demo
P. 16


                                    UMRANIYE ATASEHIR GOZTEPE METRO LINE PROJECT Within the scope of %u00dcmraniye-Ata%u015fehir-G%u00f6ztepe Metro Project, 13 km long double tube, single line TBM tunnel, 2 train storage tunnels (NATM) and 1 connection tunnel (NATM) will be constructed. There are 11 stations in total, 5 main shaft+tunnel type, 4 cut-and-cover type and 2 tunnel type. At the end of the project, the completion of the metro route works of the project, which has a capacity of 44,000 people per hour in one direction, will connect 3 districts on the Anatolian side of Istanbul. The project is expected to enter service in 2025. The construction of the project is being carried out by %u00dcAG Metro project management, of which Nurol Construction is an equal partner. Project financing was provided by %u0130stanbul Metropolitan Municipality through the European Bank for Reconstruction and Development (EBRD). The project is managed in accordance with EBRD environmental and social performance requirements and its performance is regularly reported. ALGERIA BOUKHROUFA DAM PROJECTSigned in 2013, the Boukhroufa Dam is being constructed on the Boukhroufa Stream passing 9 km south of the city of Bouteldja in El Tarf province of Algeria to provide irrigation water to the agricultural lands in the region. The dam is 87 m high from the foundation and of clay core earth embankment type and will have a storage volume of 86,000,000 m%u00b3 in its reservoir when completed. Within the scope of the project, 2,143,476 m%u00b3 of excavation, 4,927,800 m%u00b3 of filling and 106,926 m%u00b3 of concrete works are carried out. In the project in 2023:90,529 m3 excavation production107,861 m3 of reinforced concrete production15,262 tons of iron laborIn 2023, since the works were suspended due to the delay in Avenant approval, no manufacturing was carried out, and the total as of the end of 2023. Total as of project start:2,140,558 m3 embankment production4,880,296 m3 of embankment production72,349 m3 concrete production67,796 m of injection drilling was done.Umraniye Atasehir Goztepe Metro ProjectAbout The Report15Algeria Boukhroufa Dam ProjectONGOING PROJECTS IN 2023Our Sustainability ApproachAbout The ReportUn Global Compact Content IndexApplicable Gri Sector StandardGovernanceSocialPerformance Indicators DetailsEcosystemTotal as of project start: 1,690,501 m3 of excavation265,176 m3 of reinforced concrete production37,522 tons of iron labor20,447 m TBM advance and 13,888 segments were completed.
                                
   10   11   12   13   14   15   16   17   18   19   20