Gebze – Orhangazi – İzmir Motorway,

          Orhangazi 4  Section Project (Km: 34+350 - 43+296)
                                  th





          Location:                          Nurol has undertaken the construction, with the exception of the
          Orhangazi-Bursa / TURKEY           superstructure, of Orhangazi 4  section, a part of the 1st stage of the
                                                                            th
          Type of Work: 2x3 lane motorway    motorway project to be constructed between Gebze and İzmir as per
          Length of Motorway: 9 km           the Implementation Contract signed on 27 September 2010 between
                                             the General Directorate of Highways and Otoyol Yatırım ve İşletme A.Ş.
                                             which became effective on 15 March 2013. The project scope includes
                                             the construction of 9 km of motorway, 2 girder bridges, 1 pedestrian
                                             overpass, 16 underpasses, 17 box culverts, 2 retaining walls and 9
                                             derivation channels. During the works, over 6,000,000 m³ of excavation
                                             and filling were carried out along with the manufacture of over 90,000
                                             m³ of reinforced and plain concrete and over 8,000 tons of ironwork. In
                                             addition to the service facilities on both flow directions at Km: 37+500,
                                             an intersection and a toll gate will be placed at Km: 40+000 connecting
                                             the main motorway to the existing Orhangazi - İznik State Road.