Ümraniye – Ataşehir – Göztepe Metro Project
Location: The project involves construction of a 13 km long
Ümraniye, Ataşehir, Göztepe - İstanbul / TURKEY double tube TBM tunnel along with 2 train storage
Type of Work: Underground Railway Construction tunnels (NATM) and a connection tunnel (NATM).
Length of Metro Line: 13 km There will be 11 stations in the project, 5 of which are
Number of Stations: 11 main shaft + tunnel type. The contract also includes
Number of Train Storage Tunnels: 2 24 months of management and maintenance
services following the finalization of the work,
Nurol’s Joint Venture was awarded the tender held preparation of operation and maintenance manuals,
on 3 March 2017 by the Metropolitan Municipality of supply of spare parts, consumables, and particular
İstanbul. The Implementation Contract was signed on tools and equipment for 2 years, as well as offering
14 April 2017. in-service or abroad trainings.