Page 30 - NUROL İNŞAAT TANITIM KATALOĞU EN
P. 30

Ümraniye – Ataşehir – Göztepe Metro Project




          Location:                                                The project involves construction of a 13 km long
          Ümraniye, Ataşehir, Göztepe - İstanbul / TURKEY          double tube TBM tunnel along with 2 train storage
          Type of Work: Underground Railway Construction           tunnels (NATM) and a connection tunnel (NATM).
          Length of Metro Line: 13 km                              There will be 11 stations in the project, 5 of which are
          Number of Stations: 11                                   main shaft + tunnel type. The contract also includes
          Number of Train Storage Tunnels: 2                       24 months of management and maintenance
                                                                   services  following  the  finalization  of  the  work,
          Nurol’s Joint Venture was awarded the tender held        preparation of operation and maintenance manuals,
          on  3  March  2017  by  the  Metropolitan  Municipality  of   supply of spare parts, consumables, and particular
          İstanbul. The Implementation Contract was signed on      tools and equipment for 2 years, as well as offering
          14 April 2017.                                           in-service or abroad trainings.




































































          30 | Infrastructure Projects
   25   26   27   28   29   30   31   32   33   34   35