Page 28 - NUROL İNŞAAT TANITIM KATALOĞU EN
P. 28

Ilısu Dam and Hydroelectric Power Plant Project







          Location: Tigris River – Mardin / TURKEY                 The Ilısu Dam and Hydroelectric Power Plant project,
          Type of Work: Concrete face, rock-fill dam               led by an international consortium of which Nurol owns
          Dam Body Volume: 23,760,000 m    3                       50% of shares in construction, and leads with 32% of
          Reservoir Volume: 10.4 billion m 3                       overall project shares, is the final and major project of
          Installed Capacity: 1,200 MWe                            the South Eastern Anatolian Development Project. Once
          Power Plant Type: Semi Underground                       the project is finalized, it shall be the second largest dam
          Annual Energy Production: 4,120 GWh                      in Turkey regarding dam body volume, and the fourth
          Height from Foundation: 131 m                            biggest in terms of installed capacity.
          Crest Length: 1,775 m




































































          28 | Infrastructure Projects
   23   24   25   26   27   28   29   30   31   32   33