Gebze – Orhangazi – İzmir Motorway,


          Balıkesir – Kırkağaç – Akhisar Section Project

          (Km: 224+300 - 317+284)




          Location:                      Nurol has undertaken and currently maintains the construction of Balıkesir
          Balıkesir / TURKEY             – Kırkağaç – Akshisar section of the 2  stage of the motorway project to be
                                                                               nd
          Type of Work: 2x3 lane         constructed between Gebze and İzmir as per the Implementation Contract
          motorway                       signed on 27 September 2010 between the General Directorate of Highways
          Length of Motorway: 93 km      and Otoyol Yatırım ve İşletme A.Ş. which became effective on 15 March 2013.
                                         The project scope includes the construction of 93 km of motorway, 6 viaducts,
                                         37 girder bridges, 75 underpasses, 224 box culverts, 6 retaining walls and 10
                                         derivation channels. During the works, 25.1 million m  of cut excavation, 7.6
                                                                                              3
                                         million m  of borrow excavation, and 25.8 million m  of filling were carried out,
                                                  3
                                                                                           3
                                         along with the manufacture of 900,000 m  of concrete, 3,319 girders, 19,642 m
                                                                                  3
                                         of pile, 4.4 million tons of cold mix, and 2.2 million tons of hot mix, all adding
                                         up to a total of 6.6 million tons of superstructure materials. In addition to
                                         the 5 motorway service facilities on both flow directions, 5 intersections and
                                         toll gates shall be placed at this section to connect the main motorway to
                                         Balıkesir, Savaştepe, Soma, Kırkağaç and Aksihar settlements.