           ENVIRONMENTAL AWARENESS


                                                                                           WASTE-WATER MANAGEMENT
            In our Boukhroufa Dam Project: We utilize water from the riverbed              Depending on the infrastructure in the regions where we operate, domestic waste
            for the operation of the crushing facility, and after the operation of         water disposal methods are determined at the planning stages of our projects,
            the facility, the wastewater is held in a settling pond, allowing the          and domestic waste water is transferred to the sewage system in the regions
            suspended materials to separate.                                               with the appropriate infrastructure. In areas where there is no sewage system,
                                                                                           we use a septic tank application or treatment system depending on the number
                                                                                           of employees envisaged to stay in the camp.
           The separated water from the settling pond is then used for compacting the
           embankment, road watering, and injection drilling activities. In 2022, out of the   In our projects where there is no proper sewage system, we obtain the permissions
           16,150 m  of water drawn from the Boukhroufa River for the crushing facility,   from  the legal  authorities  and install septic  tanks.  The septic  tanks  are
                  3
                                                       3
           4,250 m  is used for embankment watering, 4,640 m  for road watering, and 1,300   constructed as leak proof to eliminate the environmental impact and are checked
                  3
                                              3
           m  for injection drilling, totaling 10,190 m  being reused. The remaining 5,960 m    by the authorized institution for the leak proof after installation. Waste water
             3
                                                                               3
           of water, after this usage, has been discharged back into the river.            disposal protocol is made with the institutions that will discharge the wastewater
                                                                                           in our region, and in accordance with the protocol, the wastewater is sent to the
           We take the following measures for water conservation in our projects:          discharge area at regular intervals by means of a vacuum truck. Withdrawal receipt
           l Conducting awareness campaigns and providing training to increase knowledge   records are kept for each shot. After the withdrawal, we also obtain information
           about water usage.                                                              about the areas where the vacuum truck casts, and we examine its environmental
                                                                                           compatibility.
           l Employing visual aids and signage at water usage locations to prevent
           unnecessary water use.
                                                                                           In accordance with the legal regulations, in case the number of personnel
           l Continuous monitoring of water consumption in the camp areas, with skilled    staying in the camp is not suitable for septic tanks, package treatment systems
           teams in place to promptly address any leaks or issues that may increase water  are installed. We carry out periodic checks of these systems and perform their
           consumption.                                                                    maintenance and breakdowns without delay.
           l Procuring energy-efficient appliances during the purchasing process, and
           ensuring that appliances are operated in economical modes.                      Prevention of spillage-scattering and the corrective interventions in cases where it
                                                                                           prevented the other dimensions of our wastewater management. In this context,
           l Centralizing vehicle washing systems to achieve water savings.                applications in our projects are mentioned under the heading Waste Management.
           l Regular disinfection of water tanks that store and supply water for usage,
           ensuring water quality and reducing the need for bottled water.                 We present below the details of our wastewater management and discharge to
                                                                                           receiving environments, specific to our projects.
           l Selecting circulation-based water recycling units for wheel washing facilities
           at construction sites to prevent water wastage. The water used in these units is  In Izmir Çiğli Tram Line Project, after using water sourced from the municipal
           collected, separated from sediments in a settling pond, and then returned to the  system, we discharge it into the İZSU (İzmir Water And Sewage Administration)
           system for reuse in washing.
                                                                                           drainage lines in accordance with the permits obtained. Regular checks are
           l Implementing water-saving measures in projects with mechanical plants to      conducted on the discharge lines of site usage water, and measures are taken to
           avoid using excess water when materials are moist.                              prevent leaks and spills.