Page 45 - 2022 NUROL YES SUSTAINABILITY REPORT
P. 45

OCCUPATIONAL          WORKING     OUR    PERFORMANCE          APPLICABLE
                                               CORPORATE   FINANCIAL         SUSTAINABILITY   ENVIRONMENTAL   VALUE CHAIN                           UNGC CONTENT
                                                PROFILE   OUTLOOK  GOVERNANCE  APPROACH  AWARENESS  HEALTH AND   MANAGEMENT  LIFE IN NUROL   CONTRIBUTION TO   INDICATORS   INDEX  GRI SECTOR
                                                                                                   SAFETY             CONSTRUCTION  SOCIETY  DETAILS            STANDARD
           ENVIRONMENTAL AWARENESS

                                                                                           Water Discharge By Receiving Environment
           In Boukhroufa Dam Project,  a  package biological  treatment  plant  is  available,               Waste Water      Quantity     Wastewater Discharge
           depending on the number of employees. Periodic checks for biological treatment are   Project        Source         (m /year)      Point and Method
                                                                                                                                3
           ensured, and in case of any malfunction, wastewater is planned to be extracted using
           a vacuum truck and transported to the treatment facility in the area. The treated   Romania        Camp Area                   Biological Wastewater
           wastewater is discharged into the Boukhroufa River. Since the water is treated before   3B5 Highway   Domestic Usage  5,537.00  Treatment Plant
           discharge, there is no adverse impact from the wastewater. Subcontractor personnel   Project
           staying in Nurol Construction’s camp area participate in a joint wastewater disposal                                           After biological treat-
           practice. Periodic wastewater analyses ensure compliance with discharge limits.                   Construction     12,474.00   ment, it is given to the
                                                                                                              Camp Area                   Boukhroufa Stream with
           The slurry water from our stone crusher is reused after settling in sedimentation   Boukhroufa                                 free flow.
           ponds, and the surplus water obtained after settling flows into the river. Periodic   Dam Project                              After the settling basin,
           cleaning of the sedimentation ponds at the stone crusher ensures prevention of                                                 the water is reused or
           clay and silt accumulation.                                                                      Stone Crusher     5,960.00    given to the Boukhroufa
                                                                                                                                          Stream with free flow.
           In Souk Tleta Dam Project, domestic wastewater is discharged into the                                                          It is provided with
           local sewage system using local septic tanks located in the lower area of the    Souk Tleta Dam   Construction     15,673.67   sewage system and
           construction site. This sewage system connects to the wastewater treatment           Project       Camp Area                   gravitational flow.
           plant in the Oued Smar region. The water leaving the system is known to flow
           into the Bougdura River bed and eventually reach the Mediterranean. There is no    Ümraniye-
           information suggesting significant effects on the water body and related habitats   Ataşehir-   Construction Site,
           based on the opinions of relevant experts (municipal officials).                 Göztepe Metro   Camp Area and    203,201.00   İSKİ Sewer Lines
                                                                                                               Offices
                                                                                              Line Project
           In Souk Tleta Dam Project, if there is any blockage in the wastewater systems,
           vacuum truck services are provided.                                              İzmir Çiğli Tram
                                                                                              Line Project   Utility Water    9,167.00    İZSU Sewer Lines
           In Romania 3B5 Highway Project, due to the absence of sewage infrastructure
           in the location, we have constructed four septic tanks in the construction camp                                                                     3
           area in compliance with our procedures and local regulations. At regular intervals,   Table 9: Amounts of Water Discharge to the Receiving Environment within the scope of the projects (m )
           our wastewater is transported by a contracted company for disposal. There is no
           discharge of any wastewater into the receiving environment.

           In Ümraniye-Ataşehir-Göztepe Metro Project, all wastewater from our
           construction sites and camp areas is discharged into the İSKİ (İstanbul Water And
           Sewage Administration) wastewater sewage system. All discharged wastewater
           reaches İSKİ-owned wastewater treatment plants. In this context, we pay our
           canal participation fees to İSKİ and obtain Discharge permits opinions from İSKİ
           for our wastewater discharges, in compliance with the limit values specified in the
           İSKİ Wastewater Discharge Regulation.

                                                                                                                                                                   45
   40   41   42   43   44   45   46   47   48   49   50