Page 44 - NUROL İNŞAAT TANITIM KATALOĞU EN
P. 44
İstanbul Metro Project
Phase 1 Section 1 (Şişli - 4. Levent)
Location: İstanbul / TURKEY The project was undertaken by a joint venture, of which
Number of Stations: 3 Nurol has 30% of shares. In addition to the tunnel
Excavation Depth: 20-30 m and station structures constructed in New Austrian
Tunnel Length: 2 x 2,668 m Tunneling Method, a cut and cover tunnel sized 2 x 165
Type of Work: Circular cross-section railway m, as well as a retaining wall that is 390 m in height
(metro) tunnels were also completed.
Tunnel Concrete Inner Diameter: 5.40 m
44 | Infrastructure Projects