Page 45 - NUROL İNŞAAT TANITIM KATALOĞU EN
P. 45

Bolaman – Perşembe Dual Highway Project







          Location: Ordu / TURKEY                         Engineering Structures:  46 culverts and underpasses;
          Type of Work: 2x2 lane dual highway             42 bridges (24 with single span; 3 with two spans; 10 with
          Length of Highway: 27 km                        three spans; 3 with four spans; 2 with five spans)
          Number of Tunnels: 5x2
          Total Length of Tunnels: 4,600 x 2 m (The       The highway construction work was undertaken by a joint
          longest measures 3,800 x 2 m)                   venture under the leadership of Nurol and the financing was
          Total Length of Bridges: 4,300 x 2 m            provided by foreign loans arranged by the joint venture.






































































                                                                                           Infrastructure Projects | 45
   40   41   42   43   44   45   46   47   48   49   50