Page 75 - NUROL İNŞAAT TANITIM KATALOĞU EN
P. 75

Al Shohub School, Development of Plot P2,
          Sector SE 44
          • Location: Abu Dhabi / UAE • Type of Work: Turnkey School Building
          • Total Area: 14,500 m² The Project comprises the construction,
          completion and maintenance of the Al Shohub School including civil
          & electromechanical works. The School consist of a ground and a first
                                     2
          floor making a total area of 14.500 m .









                                                                   Baghdad Al Sadr City Stadium
                                                                   • Location: Baghdad / IRAQ • Type of Work: Stadium, training
                                                                   grounds and hotel complex • Seating Capacity: 30,000 •Sadr City
                                                                   Stadium Project comprises of the turnkey construction of a stadium
                                                                   with 30,000 seating capacity in Baghdad, the capital of the Republic
                                                                   of Iraq. The project also includes turnkey constructions of trainings
                                                                   grounds of 2,500 spectator seating capacity, and a hotel building.











          Al Fateh University, Campus B
          Infrastructure Works
          • Location: Tripoli / LIBYA • Type of Work: All sorts of infrastructure
          works including sewerage, potable water, natural gas pipelines,
          road works etc. • The project in Tripoli/ Libya consists of the entire
          infrastructure  works  for  the  Campus  B  construction  of Al  Fateh
          University.










                                                                  Al Fateh University, Construction of Physical
                                                                  Education Faculty and Landscaping Works
                                                                  • Location: Tripoli / LIBYA • Type of Work: Faculty buildings • Closed
                                                                  Area:  21,600  m²  •  The  project  includes  the  turnkey  delivery  of  the
                                                                  faculty building and relevant landscaping works in a period of 17
                                                                  months.












                                                                                          Superstructure Projects | 75
   70   71   72   73   74   75   76   77   78   79   80