Page 77 - NUROL İNŞAAT TANITIM KATALOĞU EN
P. 77

Ghardez ANA Brigades and Military Hospital


         • Location: Ghardez / AFGHANISTAN • Type of Work: Military facilities
         and military hospital complex • Total Closed Area: 29.500 m² • The
         project, undertaken by a joint venture of which Nurol owns 50%,
         contains 36 military (permanent) barracks, a headquarters building, a
         service building, warehouses, garages, hospital building and necessary
         infrastructure as well as related electromechanical works.










                                                                  Nakheel International City, Residential /
                                                                  Commercial Buildings – Package 12
                                                                  •Location: Dubai / UAE • Type of Work: Housing complex • Number
                                                                  of Housing Blocks: 34 • Total Closed Area: 185,000 m² • The project
                                                                  consists of luxurious housing blocks constructed in Spanish
                                                                  architectural style.












          Darulaman Brigade Facilities
          • Location: Kabul / AFGHANISTAN • Type of Work: Military facilities
          • Closed Area: 12,600 m² • The project consists of the construction
          of 11 military (permanent) barracks, 1 social facility, 1 administration
          building, 2 guard houses, 1 heliport, and relevant infrastructure works.
          The facilities were completed by a joint venture, of which Nurol owns
          50% of shares, in a period of 8 months under heavy security measures
          and challenging environmental conditions in a troubled area.











                                                                  Pol-e Charkhi Brigade Facilities
                                                                  •Location: Kabul / AFGHANISTAN • Type of Work: Military facilities
                                                                  • Closed Area: 12,000 m² • Project consists of the construction of
                                                                  30 military (permanent) barracks and 1 dining room, as well as
                                                                  necessary infrastructure works and relevant electromechanical
                                                                  works. The facilities were completed by a joint venture, of which
                                                                  Nurol owns 50% of shares, in a period of 7 months under heavy
                                                                  security measures and challenging environmental conditions in a
                                                                  troubled area.







                                                                                          Superstructure Projects | 77
   72   73   74   75   76   77   78   79   80   81   82