Al Jadida Safi Motorway Lot 3 & 4 Project

PROJECT NAME : Al Jadida Safi Motorway Lot 3 & 4 Project
LOCATION : Oualidia / MOROCCO
TYPE OF THE PROJECT : 2x2 Lane Motorway
LENGTH OF THE
MOTORWAY : 82,1 km

DESCRIPTION
El Jadida-Safi Motorway Project is under construction in order to contribute to touristic, industrial and social development of the Atlantic region of Morocco. Lots 3 and 4, adding up to 82,1 km of the project, were constructed by Nurol Construction and Trading Co.. Project’s scope includes 8.600.000 m3 excavation, 7.600.000 m3 fill, 170.000 m3 concrete, 860.000 tons of hot mix asphalt layer and miscellaneous motorway structures.
TOP