           PROJECTS: ONGOING AND IN                                                        UMRANIYE ATASEHIR GOZTEPE METRO LINE PROJECT
                                                                                           Within the scope of our Umraniye-Atasehir-Goztepe Metro Project, which was
           THE SCOPE OF REPORT                                                             undertaken in 2017 by the contract signed with Istanbul Metropolitan Municipality,
                                                                                           13 km long double tube, single line TBM tunnel, 2 train depots (NATM) and
                                                                                           connection tunnel (NATM) will be constructed.  There are a total of 11 stations in the
           ALGERIA SOUK TLETA DAM PROJECT                                                  Project, 5 of which are of the main shaft + tunnel type, 4 of which are cut-and-cover
           Souk Tleta Dam is under the construction by Nurol Construction at the Tizi Ouzou   type and 2 are of the tunnel type. With the completion of the metro route under the
           province of Algeria. It is located on the Bougdoura Stream, 8 km south of the   contract, 3 districts on the Anatolian side of Istanbul will be connected.
           Draa Ben Khedda city, to provide irrigation and drinking water for Tizi Ouzou and
           Boumerdes regions. The dam is a clay core rock fill dam, and it will be 88,70 m high
                                                                         3
           from the foundation, once completed its reservoir will have 98,000,000 m  capacity.   Umraniye Atasehir                   In 2022, for the Project:
                                                                                                                                             3
                                                                                            Goztepe Metro Line                       433,705.03 m  cut excavation works
                                                                                                                                            3
           In 2022, for the Project:          In the Project as of the end of 2022, total:  Project                                  69,372.23 m  reinforced concrete works
           348 m  cut excavation works        1,458,671 m  cut excavation works                                                      11,033.52 tons reinforcement works
                                                     3
               3
                3
           27,012 m  filling works            348,300 m  filling works                                                               4,974.80 m TBM tunnel works
                                                     3
           17,796 m injection works           47,685 m injection works                                                               1,923 pieces segment works was completed.
           2,694 m  reinforced concrete works was completed.  132,654 m  reinforced concrete works completed.
                3
                                                     3
                                                                                                                                     In the Project as of the end of 2022, total:
           Expected project completion: July 2026.                                                                                   2,366,321 m  cut excavation works
                                                                                                                                            3
                                                                                                                                           3
                                                                                                                                     276,507 m  reinforced concrete works
                                                                                                                                     44,241 tons reinforcement works
                                                                                                                                     20,447 m TBM tunnel works
                                                                                                                                     13,888 pieces segment works
                                                                                                                                     was completed.
                                                                                           Expected project completion: May 2025.
                                                                                           NUSFALAU - SUPLACU DE BARCAU 3B5 (KM 66 + 500 - KM 80 + 054.044)
                                                                                           MOTORWAY DESIGN AND CONSTRUCTION PROJECT
                                                                                           The project consists of the construction of a 13.5 km 2x2 motorway with 5 bridges
                                                                                           and 7 overpass structures. The main work items include Design, Earthworks, Art
                                                                                           Structures, Infrastructure Transfers, Sub-base, Foundation and Hot Bituminous
                                                                                           Mixture and Bridge and Overpass Structures. The project signing date is 30
                                                                                           September 2020 and the design works start date is February 2021.
                                                                                           In 2022, for the Project:     In the Project as of the end of 2022, total:
                                                                                           148,351 m  stripping excavation works   235,039 m  stripping excavation works
                                                                                                                                3
                                                                                                 3
                                                                                                  3
                                                                                           206,206 m  stabilization works   272,383 m  stabilization works
                                                                                                                                3
                                                                                                                                3
                                                                                           173,360 m  cut excavation works  215,849 m  cut excavation works
                                                                                                 3
                                                                                               3
                                                                                           1,159 m  filling works        1.187.851 m  filling works
                                                                                                                                3
                                                                                           6,458 m pile works            11,278 m pile works
                                                                                           33,647 m  reinforced concrete works  34,565 m  reinforced concrete works
                                                                                                 3
                                                                                                                               3
                                                                                           680 m culvert works           805 m culvert works
                                                                                           299,468 m  ballast works      299,468 m  ballast works
                                                                                                                                3
                                                                                                  3
                                                                                                                               3
                                                                                                3
                                                                                           54,221 m  stabilised ballast works  54,221 m  stabilised ballast works
                                                                                           44,498 tons bituminous base works  44,498 tons bituminous base works
                                                                                           19,783 tons binder works      19,783 tons binder works
                                                                                           169 tons wear works was completed.  169 tons wear works was completed.
                                                         Algeria Souk Tleta Dam Project
                                                                                           Expected project completion: September 2023.