Page 16 - 2022 NUROL YES SUSTAINABILITY REPORT
P. 16

OCCUPATIONAL          WORKING     OUR    PERFORMANCE          APPLICABLE
                                               CORPORATE   FINANCIAL         SUSTAINABILITY   ENVIRONMENTAL   VALUE CHAIN                           UNGC CONTENT
                                                PROFILE   OUTLOOK  GOVERNANCE  APPROACH  AWARENESS  HEALTH AND   MANAGEMENT  LIFE IN NUROL   CONTRIBUTION TO   INDICATORS   INDEX  GRI SECTOR
                                                                                                   SAFETY             CONSTRUCTION  SOCIETY  DETAILS            STANDARD
           PROJECTS: ON-GOING AND OUT OF                                                   PTO TIZI OUZOU BOUIRA INTERSECTION MOTORWAY - PTO PROJECT
                                                                                           The 48 km long connection highway between Tizi Ouzou-Bouira in Algeria is
           THE SCOPE OF REPORT                                                             operated by Özgün-Nurol Partnership, and within the scope of the Project, 48 km
                                                                                           of highway, a total of 2 x 1.670 meters of double tube tunnel, 21 viaducts, and other
                                                                                           structures, infrastructure and drainage system manufacturing will be completed.
           KONYA EĞİSTE HADİMİ VIADUCT PROJECT                                             The section of the Project between km: 0+000-20+000 and 4+500–10+000 have
           The tender related to the Eğiste Hadimi Viaduct has been carried out by the     been opened to traffic, and the remaining parts are being constructed.
           General Directorate of Highways. The contract has been awarded to Nurol
           Construction at the end of 2016. Within the scope of the Project, a viaduct with a
           total length of 1,372 meters and a width of 25 meters will be constructed; and it   In 2022, for the Project:
                                                                                           1,898,466 m  cut excavation works
                                                                                                   3
           will be one of the world’s largest balanced cantilever viaducts. The superstructure   1,084,403 m  filling works
                                                                                                   3
           will be constructed on 2 abutments and 8 piers with varying heights between 31 to   78,085 m  reinforced concrete works
                                                                                                 3
                                                                                                 3
           155 meters. The project was completed in November 2022.                         40,650 m  tunnel pavement concrete works
                                                                                           10,481 tonnes of superstructure cold mix works
           In 2022, for the Project:          In the Project as of the end of 2022, total:  4,180 tonnes of superstructure hot mix works
               3
           407 m  filling works               514,144 m  cut excavation works              was completed.
                                                    3
                3
           9,966 m  reinforced concrete works  35,800 m  filling works
                                                    3
           8,013 tons of reinforcement works  11,945 m bored pile works                    In the Project as of the end of 2022, total:
                                                                                                   3
           1,181 tons post-tensioning works   138,476 m  reinforced concrete works         18,348,736 m  cut excavation works
                                                     3
                                                                                                  3
           5,769 m guardrail                  37,152 tons of reinforcement works           4,173,098 m  filling works
                                                                                                 3
           253,653 kg pedestrian railing      3,028 tons post-tensioning works completed.  476,120 m  reinforced concrete works
                                                                                                 3
           5,488 m wire fence                 5,769 m guardrail                            630,742 m  tunnel excavation works
                                                                                                3
           27,440 m  asphalt (wearing) layer completed.  253,653 kg pedestrian railing     72,273 m  tunnel pavement concrete works
                2
                                              5,488 m wire fence                           243,401 tons of superstructure cold mix works
                                              27,440 m  asphalt (wearing) layer completed  302,702 tons of superstructure hot mix works   Pto Tizi Ouzou Bouira Intersection
                                                    2
                                                                                           was completed.                                      Motorway - Pto Project
                                                                                           Expected project completion: December 2026.
                                                                                           B1070 TEST BUILDING CONSTRUCTION PROJECT
                                                                                           B1070 Test Building contract signed with TUSAS in September 2022 included the
                                                                                           turnkey construction of a steel construction test building with a closed area of 14.258m
                                                                                                                                                                   2
                                                                                           and a height of 60 metres, and a reinforced concrete administrative building.
                                                                                                                                   In 2022, for the Project:
                                                                                                                                   54,061 m  cut excavation works
                                                                                                                                         3
                                                                                                                                   77,737 m  filling works
                                                                                                                                        3
                                                                                                                                   26,055 m  reinforced concrete works
                                                                                                                                         3
                                                                                                                                   20,867 m bored pile works
                                                                                                                                   4,545 tonnes of steel construction works
                                                                                                                                        2
                                                                                                                                   50,167 m  plating works
                                                                                                                                   In the Project as of the end of 2022, total:
                                                                                                                                   54,061 m  cut excavation works
                                                                                                                                         3
                                                                                                                                        3
                                                                                                                                   77,737 m  filling works
                                                                                                                                   26,055 m  reinforced concrete works
                                                                                                                                         3
                                                                                                                                   20,867 m bored pile works
                                                                                                                                   4,545 tonnes of steel construction works
                                                                                            B1070 Test Building Project            50,167 m  plating works
                                                                                                                                        2
                                                          Eğiste Hadimi Viaduct Project
                                                                                           Expected project completion: March 2024.
                                                                                                                                                                   16
   11   12   13   14   15   16   17   18   19   20   21