           PROJECTS: ONGOING AND IN THE SCOPE OF REPORT


           Our 2022 report includes Nurol İnşaat’s Head Office and the following ongoing projects; Algeria Souk Tleta Dam Project, Algeria Boukhroufa Dam Project, ÜAG Metro Project, Izmir Çiğli Tram Line
           Project, Nusfalau - Suplacu De Barcau 3B5 Motorway Design and Construction Project and our Head Office. Nusfalau - Suplacu De Barcau 3B5 Motorway Design and Construction Project, which
           started its operations in Romania in 2022, is included in the scope of the report. Eğiste Hadimi Viaduct and Yusufeli Dam Bridges projects were not included in the scope of the report for this year
           as they were completed in 2022. The environmental, social, and economic performances of these projects reflect Nurol Construction’s approach to sustainability issues.

           IZMIR CIGLI TRAM LINE PROJECT                                                   ALGERIA BOUKHROUFA DAM PROJECT
           Handover of the Project site, which was tendered on November 05, 2020, by Izmir   Boukhroufa Dam is under construction by Nurol Construction at the El Tarf
           Metropolitan Municipality Rail System Department, was made on December 21, 2020.   province of Algeria. It is located on the Boukhroufa Stream, 5 km south of the
           Within the scope of the project, approximately 12 km long tram line with 15 stations, 5   Bouteldja city, to provide irrigation water for agricultural lands in the region. The
           above ground and 1 underground transformer buildings, 735 meters long tram bridge and   dam is a clay core soil and rock fill dam and will be 87 m high from the foundation.
           electromechanical works will be completed. Financing of the Project is provided by the   Once completed, its reservoir will have 86,000,000 m  capacity.
                                                                                                                                       3
           external loan provided by the Izmir Metropolitan Municipality.
                                                                                           In 2022, for the Project:       In the Project as of the end of 2022, total:
           In the project in 2022:            Total by the end of 2022 in the project:     8,780 m  cut excavation works   2,140,558 m  cut excavation works
                                                                                                3
                                                                                                                                  3
           5,053 linear meters of bored pile fabrication  15,896 linear meters of bored pile fabrication  61,219 m  filling works   4,856,567 m  filling works
                                                                                                3
                                                                                                                                  3
           11,805 linear-m geopier impact column  21,328.3 linear-m geopier impact column  40 m  reinforced concrete works  53,105 m  reinforced concrete works
                                                                                                                                3
                                                                                              3
           8,081 linear-m C25 geoconcrete column works  10,517 linear-m C25 geoconcrete column works   112 m injection works was completed.  37,199 m injection works was completed.
           41,315 m  excavation works         84,719 m  excavation works
                3
                                                   3
           25,470 m  filling works            37,527 m  filling works                      Expected project completion: February 2024.
                                                   3
                 3
           46,798 m  concrete works           73,340.59 m  concrete works
                                                     3
                 3
           741 tons of reinforcement works    3,855 tons of reinforcement works
           147,850 kg miscellaneous steel works  236.,826 kg miscellaneous steel works
           445 adet catenary foundation works  674 adet catenary foundation works
           19,713 tons of asphalt works       22,712 tons of asphalt works
           14,145 line-m rail works           21.,455 line-m rail manufacturing
           173,415 m pipe works               235,381 m pipe works
           8,865 line-m medium voltage ring line laying  13,110.65 line-m medium voltage ring line laying
           32,410 m The grounding of the tram line with   49,611 he grounding of the tram line with galvanized
           galvanized strip has been completed.  strip has been completed.
           41 pieces of railroad switches and 12 pieces of   41 railroad switches and 12 cruisers installation has
           cruisersinstallation has been completed.  been completed.

           Projenin Aralık 2023’te tamamlanması planlanmaktadır.