PROJECTS: ONGOING AND IN THE SCOPE OF REPORT
Our 2022 report includes Nurol İnşaat’s Head Office and the following ongoing projects; Algeria Souk Tleta Dam Project, Algeria Boukhroufa Dam Project, ÜAG Metro Project, Izmir Çiğli Tram Line
Project, Nusfalau - Suplacu De Barcau 3B5 Motorway Design and Construction Project and our Head Office. Nusfalau - Suplacu De Barcau 3B5 Motorway Design and Construction Project, which
started its operations in Romania in 2022, is included in the scope of the report. Eğiste Hadimi Viaduct and Yusufeli Dam Bridges projects were not included in the scope of the report for this year
as they were completed in 2022. The environmental, social, and economic performances of these projects reflect Nurol Construction’s approach to sustainability issues.
IZMIR CIGLI TRAM LINE PROJECT ALGERIA BOUKHROUFA DAM PROJECT
Handover of the Project site, which was tendered on November 05, 2020, by Izmir Boukhroufa Dam is under construction by Nurol Construction at the El Tarf
Metropolitan Municipality Rail System Department, was made on December 21, 2020. province of Algeria. It is located on the Boukhroufa Stream, 5 km south of the
Within the scope of the project, approximately 12 km long tram line with 15 stations, 5 Bouteldja city, to provide irrigation water for agricultural lands in the region. The
above ground and 1 underground transformer buildings, 735 meters long tram bridge and dam is a clay core soil and rock fill dam and will be 87 m high from the foundation.
electromechanical works will be completed. Financing of the Project is provided by the Once completed, its reservoir will have 86,000,000 m capacity.
3
external loan provided by the Izmir Metropolitan Municipality.
In 2022, for the Project: In the Project as of the end of 2022, total:
In the project in 2022: Total by the end of 2022 in the project: 8,780 m cut excavation works 2,140,558 m cut excavation works
3
3
5,053 linear meters of bored pile fabrication 15,896 linear meters of bored pile fabrication 61,219 m filling works 4,856,567 m filling works
3
3
11,805 linear-m geopier impact column 21,328.3 linear-m geopier impact column 40 m reinforced concrete works 53,105 m reinforced concrete works
3
3
8,081 linear-m C25 geoconcrete column works 10,517 linear-m C25 geoconcrete column works 112 m injection works was completed. 37,199 m injection works was completed.
41,315 m excavation works 84,719 m excavation works
3
3
25,470 m filling works 37,527 m filling works Expected project completion: February 2024.
3
3
46,798 m concrete works 73,340.59 m concrete works
3
3
741 tons of reinforcement works 3,855 tons of reinforcement works
147,850 kg miscellaneous steel works 236.,826 kg miscellaneous steel works
445 adet catenary foundation works 674 adet catenary foundation works
19,713 tons of asphalt works 22,712 tons of asphalt works
14,145 line-m rail works 21.,455 line-m rail manufacturing
173,415 m pipe works 235,381 m pipe works
8,865 line-m medium voltage ring line laying 13,110.65 line-m medium voltage ring line laying
32,410 m The grounding of the tram line with 49,611 he grounding of the tram line with galvanized
galvanized strip has been completed. strip has been completed.
41 pieces of railroad switches and 12 pieces of 41 railroad switches and 12 cruisers installation has
cruisersinstallation has been completed. been completed.
Projenin Aralık 2023’te tamamlanması planlanmaktadır.
Izmir Cigli Tram Line Project Algeria Boukhroufa Dam Project