Page 55 - 2022 NUROL YES SUSTAINABILITY REPORT
P. 55
177.50
Head Office
2.54
11.67
841.00
Boukhroufa Dam Project
1,332.00
Souk Tleta Dam Project
5,820.30
60.56
Romania 3B5 Highway Project
11,831.00
75.48
İzmir Çiğli Tram Line Project
Ümraniye-Ataşehir-
Göztepe Metro Line Project
Total Training Hours (employee.hours)
Training Hour Per Employee (hour/employee)
All Trainings
Head Office
381.00
4.85
1,014.00
Boukhroufa Dam Project
1,426.00
21.9
Souk Tleta Dam Project 63,608.50 Training Hours About OHS 14.35 20.33 84.76
Romania 3B5 Highway Project 6,580.30 CORPORATE FINANCIAL 80.72 SUSTAINABILITY ENVIRONMENTAL OCCUPATIONAL VALUE CHAIN WORKING OUR PERFORMANCE UNGC CONTENT APPLICABLE
PROFILE OUTLOOK GOVERNANCE APPROACH AWARENESS HEALTH AND MANAGEMENT LIFE IN NUROL CONTRIBUTION TO INDICATORS INDEX GRI SECTOR
İzmir Çiğli Tram Line Project 12,352.00 109.08 SAFETY CONSTRUCTION SOCIETY DETAILS STANDARD
Ümraniye-Ataşehir- 64.560,50 128,76
Göztepe Metro Line Project
OCCUPATIONAL HEALTH AND SAFETY 100%
98%
99%
98%
99%
100%
Total Training Hours (employee.hours) Training Hour Per Employee (hour/employee)
The graph comparing OHS training data by years is shown below. l Functionality of the scaffolding and platforms used are checked with lists before
and after use.
l Red and green labeling are applied for scaffolding and platforms, red labels are
placed on improper scaffolding platforms and their use is prevented.
Education Rates by Years
l Traffic Management Plans are being prepared for traffic management applications
140
120 at the project site.
100 84.76 75.48 l Traffic circulation plans implemented in our İzmir Çiğli Tram Line Project, before
80 60.56 starting work and making necessary applications, are consulted with İZUM officials
60 11.67
40 20.33 on urban roads and with Highways officials on highways, and consultancy is
20 2.54 received from them. Considering the opinions, suggestions and warnings of the
0 mentioned institutions; The permit processes are completed and the applications
Head Office Romania 3B5 Boukhroufa Souk Tleta Dam Ümraniye-Ataşehir- İzmir Çiğli
Highway Project Dam Project Project Göztepe Metro Line Tram Line are continuing.
Project Project
2018 2019 2020 2021 2022 l Periodic inspections are made for all lifting equipment and pressure vessels used in
Graph 6: Education Rates by Years the project, vehicles without inspection are removed from the field.
l Before the lifting operations, the lifting plan is prepared and the relevant personnel,
Note: Since our ÜAG Metro Project included in the report in 2020 and ICTH Project included in the duties and responsibilities are transferred.
report in 2021, Romania 3B5 Highway Project included int he report in 2022 the table does not l The certificates of the lifting equipment to be used in lifting operations are checked
Work Injury Rates in Projects
include the values of the previous years. and the use of equipment that does not have the necessary documents is not allowed.
140
120 l Daily controls of the construction machines are carried out by the operators and are
OCCUPATIONAL HEALTH AND SAFETY PERFORMANCE recorded with the control form, daily breakdown maintenance is recorded.
100
80
We follow our performance on Occupational Health and Safety with the key l Construction machines are used only by authorized/certified operators.
60
performance indicators we have determined, and we take actions to improve our l Blasting work permit systematic is applied for blasting operations.
40
20
performance according to the output we obtain. By setting annual targets for our l Power tools and cables are checked and periodically controlled by the responsible
0
OHS performances, we revise these targets in line with the principle of continuous electrician before starting work. Earthing measurements of electrical equipment are
Ümraniye-Ataşehir-
İzmir Çiğli
Boukhroufa
Souk Tleta Dam
Romania 3B5
improvement every year. Dam Project Project Göztepe Metro Line Tram Line carried out once a year.
Highway Project
Project
Project
l Color coding is applied for electrical equipment and electrical controls are performed
2018 2019 2020 2021 2022
Our activities are in a very dangerous business sector. Therefore, we take in accordance with the color code procedure.
Grafik 5: Work Injury Rates in Projects
appropriate measures for our activities that have special risks. l Appropriate storage conditions are provided for chemical materials used in project
activities, material safety data sheets were provided and hung in the storage areas.
Some operational measures we have implemented for risky activities in our l In our projects, noise, vibration, dust emission and lighting measurements are
projects are as follows; made once a year and actions are taken for inappropriate values. In addition, these
l Recruitment medical examinations of all our project employees and measurements are recorded and followed at regular intervals with devices that have
subcontractors are made, and their medical examinations are renewed annually. been calibrated and certified by the OHS-E unit when necessary.
l In work conducted at heights, fall prevention systems and appropriate personal l It is ensured that the work sites are organized.
protective equipment are employed. External façade elevators are used for access l All personnel are provided to use personal protective equipment specific to the
to work areas at height. In our Ümraniye-Ataşehir-Göztepe Metro Line Project, work.
suitable and approved personnel lifting equipment is used for all high-level work, l There are fixed, permanent or temporary warning signs according to the risks
both inside and outside the tunnels. in the work site.
55