Page 55 - 2022 NUROL YES SUSTAINABILITY REPORT
P. 55

177.50
              Head Office
                                                                           2.54
                                                                           11.67
                                841.00
        Boukhroufa Dam Project
                                1,332.00
        Souk Tleta Dam Project
                                5,820.30
                                                                           60.56
     Romania 3B5 Highway Project
                                11,831.00
                                                                           75.48
      İzmir Çiğli Tram Line Project
          Ümraniye-Ataşehir-
      Göztepe Metro Line Project
                                Total Training Hours (employee.hours)
                                                      Training Hour Per Employee (hour/employee)
                                              All Trainings
                Head Office
                                 381.00
                                                                     4.85
                                 1,014.00
          Boukhroufa Dam Project
                                 1,426.00
                                                                     21.9
          Souk Tleta Dam Project  63,608.50  Training Hours About OHS  14.35  20.33  84.76
       Romania 3B5 Highway Project  6,580.30   CORPORATE   FINANCIAL   80.72  SUSTAINABILITY   ENVIRONMENTAL   OCCUPATIONAL   VALUE CHAIN   WORKING   OUR   PERFORMANCE   UNGC CONTENT   APPLICABLE
                                                PROFILE   OUTLOOK  GOVERNANCE  APPROACH  AWARENESS  HEALTH AND   MANAGEMENT  LIFE IN NUROL   CONTRIBUTION TO   INDICATORS   INDEX  GRI SECTOR
        İzmir Çiğli Tram Line Project  12,352.00                     109.08                        SAFETY             CONSTRUCTION  SOCIETY  DETAILS            STANDARD
            Ümraniye-Ataşehir-  64.560,50                                       128,76
        Göztepe Metro Line Project
           OCCUPATIONAL HEALTH AND SAFETY                                        100%
                       98%
                                              99%
                                  98%
                                                         99%
                                                                    100%
                                 Total Training Hours (employee.hours)  Training Hour Per Employee (hour/employee)
           The graph comparing OHS training data by years is shown below.                  l Functionality of the scaffolding and platforms used are checked with lists before
                                                                                           and after use.
                                                                                           l Red and green labeling are applied for scaffolding and platforms, red labels are
                                                                                           placed on improper scaffolding platforms and their use is prevented.
                                      Education Rates by Years
                                                                                           l Traffic Management Plans are being prepared for traffic management applications
            140
            120                                                                            at the project site.
            100                                               84.76  75.48                 l Traffic circulation plans implemented in our İzmir Çiğli Tram Line Project, before
            80                60.56                                                        starting work and making necessary applications, are consulted with İZUM officials
            60                            11.67
            40                                      20.33                                  on urban roads and with Highways officials on highways, and consultancy is
            20      2.54                                                                   received from them. Considering the opinions, suggestions and warnings of the
             0                                                                             mentioned institutions; The permit processes are completed and the applications
                 Head Office  Romania 3B5   Boukhroufa   Souk Tleta Dam   Ümraniye-Ataşehir-  İzmir Çiğli
                          Highway Project  Dam Project  Project  Göztepe Metro Line   Tram Line   are continuing.
                                                           Project  Project
                                   2018  2019  2020  2021  2022                            l Periodic inspections are made for all lifting equipment and pressure vessels used in
                                   Graph 6: Education Rates by Years                       the project, vehicles without inspection are removed from the field.
                                                                                           l Before the lifting operations, the lifting plan is prepared and the relevant personnel,
           Note: Since our ÜAG Metro Project included in the report in 2020 and ICTH Project included in the   duties and responsibilities are transferred.
           report in 2021, Romania 3B5 Highway Project included int he report in 2022 the table does not   l The certificates of the lifting equipment to be used in lifting operations are checked
                                      Work Injury Rates in Projects
           include the values of the previous years.                                       and the use of equipment that does not have the necessary documents is not allowed.
                 140
                 120                                                                       l Daily controls of the construction machines are carried out by the operators and are
           OCCUPATIONAL HEALTH AND SAFETY PERFORMANCE                                      recorded with the control form, daily breakdown maintenance is recorded.
                 100
                 80
           We follow our performance on Occupational Health and Safety with the key        l Construction machines are used only by authorized/certified operators.
                 60
           performance indicators we have determined, and we take actions to improve our   l Blasting work permit systematic is applied for blasting operations.
                 40
                  20
           performance according to the output we obtain. By setting annual targets for our   l Power tools and cables are checked and periodically controlled by the responsible
                  0
           OHS performances, we revise these targets in line with the principle of continuous   electrician before starting work. Earthing measurements of electrical equipment are
                                                      Ümraniye-Ataşehir-
                                                                 İzmir Çiğli
                                 Boukhroufa
                                            Souk Tleta Dam
                       Romania 3B5
           improvement every year.  Dam Project  Project  Göztepe Metro Line   Tram Line   carried out once a year.
                       Highway Project
                                                                  Project
                                                         Project
                                                                                           l Color coding is applied for electrical equipment and electrical controls are performed
                                    2018  2019  2020  2021  2022
           Our activities are in a very dangerous business sector. Therefore, we take      in accordance with the color code procedure.
                                     Grafik 5:  Work Injury Rates in Projects
           appropriate measures for our activities that have special risks.                l Appropriate storage conditions are provided for chemical materials used in project
                                                                                           activities, material safety data sheets were provided and hung in the storage areas.
           Some operational measures we have implemented for risky activities in our       l In our projects, noise, vibration, dust emission and lighting measurements are
           projects are as follows;                                                        made once a year and actions are taken for inappropriate values. In addition, these
           l Recruitment medical examinations of all our project employees and             measurements are recorded and followed at regular intervals with devices that have
           subcontractors are made, and their medical examinations are renewed annually.   been calibrated and certified by the OHS-E unit when necessary.
           l In work conducted at heights, fall prevention systems and appropriate personal   l It is ensured that the work sites are organized.
           protective equipment are employed. External façade elevators are used for access  l All personnel are provided to use personal protective equipment specific to the
           to work areas at height. In our Ümraniye-Ataşehir-Göztepe Metro Line Project,   work.
           suitable and approved personnel lifting equipment is used for all high-level work,  l There are fixed, permanent or temporary warning signs according to the risks
           both inside and outside the tunnels.                                            in the work site.
                                                                                                                                                                   55
   50   51   52   53   54   55   56   57   58   59   60