ORDU RING ROAD SUPPLY WORKS PROJECT The 21.4 km long 2x2 divided road project of Ordu Ring Road includes 6 double tube tunnels with a total length of 9.5 km, 7 viaducts with a total length of 3.7 km, 5 bridges and 7 interchanges. The productions required to be made within the scope of the contract were completed and provisional acceptance was issued as of December 2017 and final acceptance was issued as of December 2018. Due to landslides occurring on the route of Ordu Ring Road project, the Landslide Rehabilitation Works, which were opened to tender due to landslides occurring on the route of Ordu Ring Road project, were put under our contract in July 2016, and the productions within the scope of the relevant scope were completed and provisional acceptance was arranged as of October 2017 and final acceptance was arranged as of October 2018.The tender for the remaining works of the Ordu Ring Road project was won by the partnership led by Nurol Construction. The Ordu Ring Road Supply Works Contract was signed in July 2017 and construction works continue in accordance with the work programme. The 10.7 km section of the project between Per%u015fembe Junction and Otogar Junction was opened to traffic in 2019.SILIFKE-MUT ROAD PROJECTSilifke-Mut Road Project has been under our contract in 2017. The project, which is planned to be completed in 2025, includes the construction of 14.2 km long 2x2 road including the 2nd K%u0131l%u0131%u00e7 Arslan Bridge with inclined suspension and balanced cantilever deck and 3 NATM tunnels with a total length of 6,860 m.About The Report18ONGOING PROJECTS IN 2023Our Sustainability ApproachAbout The ReportUn Global Compact Content IndexApplicable Gri Sector StandardGovernanceSocialPerformance Indicators DetailsEcosystemSupplementary Works Of Ordu Ring Road ProjectSilifke-Mut Road Project