Page 51 - NUROL İNŞAAT TANITIM KATALOĞU EN
P. 51
Almaty - Astana Highway,
Rehabilitation of Gulshad - Akchatau Section
• Location: KAZAKHSTAN • Type of Work: Motorway rehabilitation
works • Length of Highway: 195 km • The scope of the project,
undertaken by a joint venture owned 50% by Nurol and financed by
Asian Development Bank, the rehabilitation of the existing highway
of 12 m platform width, as well as the repairs of bridges and culverts
were carried out.
Riyadh City Waste Water Network Project
• Location: Riyadh / KINGDOM OF SAUDI ARABIA • Type of Work:
Waste water network • Length of Network: 34,500 m • Within the
scope of the project, 900 housings were connected to the waste water
network.
Eymür - Kürtün Motorway Project
• Location: Gümüşhane / TURKEY • Type of Work: highway • Length of
Highway: 40.2 km • Number of Tunnels: 6 • Total Length of Tunnels:
5,000 m • Total Length of Bridges: 350 m • Bridge Span Length: 12.5
m • In addition to the construction of the highway, a retaining wall
measuring 15,155 m in length was also constructed.
Söke Plain Irrigation Project
• Location: Söke - Aydın / TURKEY • Type of Work: Irrigation network
consisting of concrete paved trapezoidal open channels • Irrigation
Area: 1st Stage 7,740 ha, 2nd Stage 5,062 ha • The project also
included the constructions of engineering structures such as service
roads, several bridges, culverts, and siphons.
Infrastructure Projects | 51