           VALUE CHAIN MANAGEMENT



           SUBCONTRACTORS AND SUPPLIERS BY PROJECTS                                        Grouting and earthworks in our Boukhroufa Dam Project, drilling grouting works in our
                                                                                           Souk Tleta Project, and electromechanical works subcontractors in our İzmir Çigli Tram
           The main subcontractors within our İzmir Çiğli Tram Line Project are companies that   Line Project are in the highest proportion of the project budgets. In these projects,
           perform excavation and filling works, bored pile works, earth concrete works, line   where subcontractors are used at a lower rate compared to our other projects, we also
           construction works, viaduct reinforced concrete construction works, electromechanical   monitor the sustainability performances of our subcontractors.
           works and infrastructure works. The suppliers are; are the companies that supply rail
           and rail fastening materials, ready-mixed concrete, supply of catenary foundation   In our Performance Evaluation section, in the table that indicates the ratio of supplier
           anchors and fiber reinforcement.                                                expenses within the project budgets, the suppliers that are in the highest proportion
                                                                                           in the total budget for each project are included in the second party audit plans and
           The main subcontractors within Boukhroufa Dam Project are companies that perform   their sustainability performances are reviewed.
           reinforced concrete works, excavation and filling works, drilling and grouting works.
           The suppliers are; are the companies  that supply aggregate, re-bar, cement  and   DIGITAL TRANSFORMATION
           explosives.                                                                     As Nurol Construction, we have executed numerous projects  as part of our
                                                                                           digitalization initiatives aimed at maintaining our operations with consistent quality
           The main subcontractors within the Souk Tleta Dam Project are companies that carry   and standards across diverse geographies, adhering  to uniform company  rules.
           out concrete works, drilling works and rental equipment. The main suppliers are   As part of this initiative, the installation of the M-Files system was successfully
           cement, sand, aggregate and re-bar providers.                                   completed in 2021. The system encompasses functionalities such as Incoming and
                                                                                           Outgoing Documents, Integrated Management Systems Document Management,
           Within the scope of Ümraniye-Ataşehir-Göztepe Metro Line Project, our main      Corrective Action Systematics, Legal Requirements and Standard Library, as well
           subcontractors are companies that perform tunnel works, soil (excavation-excavation)   as Project Control reporting applications, all of which are actively utilized. In 2022,
           works, ground improvement works, infrastructure displacement works, mechanical   efforts were launched to introduce new modules to the M-Files software system. The
           works, finishing works, reinforced concrete and shoring works. The suppliers are the   infrastructures for the Field Quality/OHS/Environmental Non-Compliance, Incident
           companies that supply concrete, bolts / bolts / ground nails, steel mesh, cement and   Investigation/Notification, and Subcontractor Selection Process Bid Comparison
           chemicals, gaskets, iron, shotcrete, fuel oil, TBM spare parts and insulation materials.  Modules have been prepared and are scheduled to go live in 2023.