VALUE CHAIN MANAGEMENT
SUBCONTRACTORS AND SUPPLIERS BY PROJECTS Grouting and earthworks in our Boukhroufa Dam Project, drilling grouting works in our
Souk Tleta Project, and electromechanical works subcontractors in our İzmir Çigli Tram
The main subcontractors within our İzmir Çiğli Tram Line Project are companies that Line Project are in the highest proportion of the project budgets. In these projects,
perform excavation and filling works, bored pile works, earth concrete works, line where subcontractors are used at a lower rate compared to our other projects, we also
construction works, viaduct reinforced concrete construction works, electromechanical monitor the sustainability performances of our subcontractors.
works and infrastructure works. The suppliers are; are the companies that supply rail
and rail fastening materials, ready-mixed concrete, supply of catenary foundation In our Performance Evaluation section, in the table that indicates the ratio of supplier
anchors and fiber reinforcement. expenses within the project budgets, the suppliers that are in the highest proportion
in the total budget for each project are included in the second party audit plans and
The main subcontractors within Boukhroufa Dam Project are companies that perform their sustainability performances are reviewed.
reinforced concrete works, excavation and filling works, drilling and grouting works.
The suppliers are; are the companies that supply aggregate, re-bar, cement and DIGITAL TRANSFORMATION
explosives. As Nurol Construction, we have executed numerous projects as part of our
digitalization initiatives aimed at maintaining our operations with consistent quality
The main subcontractors within the Souk Tleta Dam Project are companies that carry and standards across diverse geographies, adhering to uniform company rules.
out concrete works, drilling works and rental equipment. The main suppliers are As part of this initiative, the installation of the M-Files system was successfully
cement, sand, aggregate and re-bar providers. completed in 2021. The system encompasses functionalities such as Incoming and
Outgoing Documents, Integrated Management Systems Document Management,
Within the scope of Ümraniye-Ataşehir-Göztepe Metro Line Project, our main Corrective Action Systematics, Legal Requirements and Standard Library, as well
subcontractors are companies that perform tunnel works, soil (excavation-excavation) as Project Control reporting applications, all of which are actively utilized. In 2022,
works, ground improvement works, infrastructure displacement works, mechanical efforts were launched to introduce new modules to the M-Files software system. The
works, finishing works, reinforced concrete and shoring works. The suppliers are the infrastructures for the Field Quality/OHS/Environmental Non-Compliance, Incident
companies that supply concrete, bolts / bolts / ground nails, steel mesh, cement and Investigation/Notification, and Subcontractor Selection Process Bid Comparison
chemicals, gaskets, iron, shotcrete, fuel oil, TBM spare parts and insulation materials. Modules have been prepared and are scheduled to go live in 2023.